Amendment 0006 is issued. Please see amendment 0006 in attachment section and associated documents. The proposal due date is extended to 11-6-2026. Government posted Final Response to RFIs, Revised Bid Scheduled, Additional solicitatio attachents in the attachment section of this proposal. No additional questions will be accepted not answered.
_________________________________________________________
**Notice is issued. The government will extended the solicitation to incorporate final responses to RFIs. An Amendment will be issued on 10-22-26 by 6:00pm CST to incorporate remainng responses and extend RFP due date to 11/6/2026. The station is currently completing government's final response. **
Amendment 0005 is issued. Please see amendment 0004 in attachment section and associated documents. The proposal due date remains 10-26-2026. Government posted 100 % Bid Documents Full Set Drawings in attachment section of his proposal.
Amendment 0004 is issued. Please see amendment 0004 in attachment section and associated documents. The proposal due date has changed to 10-26-2026. Government response to RFIs are posted & the project specification is revised.
Amendment 0003 is issued. Please see amendment 0003 in attachment section and associated documents. The proposal due date has changed to 10-14-2026.
Amendment 0002 is issued. Please see amendment 0002 in attachment section and associated documents. The proposal due date has changed to 9-23-2026.
Amendment 0001 is issued. Please see amendment 0001 in attachment section and associated documents. The proposal due date has changed to 9-1-2026.
8/4/2026:THE SITE VISIT LOCATION HAS BEEN UPDATED TO RERFLECT:
SITE VISIT: A site visit will be conducted on 08-5-2026 at 10:00 AM CST. Location: Saint Louis VAMC Building #16,
Room #B201 on the 2nd Floor at 10:00AM CST. The building is located directly across from the Emergency Room.
POC: WALTER STAAS PHONE:314-652-4100 JCx58723
PLEASE RESPOND BY THE SPECIFIED DATE AND TIME TO BE CONSIDERED FOR CONTRACT AWARD.
The contractor shall provide all supervision, tools, labor, materials, equipment, transportation, incidentals, and testing necessary to completely prepare the site for building operations, including demolition and removal of existing structures, and perform work for Project Number 657-26-602JC – Create Observation Unit, JC. The project includes, but is not limited to, general construction, alterations, mechanical, plumbing and electrical work, and certain other items necessary for completion and installation of new work. The work will focus on creating a 3-bed observation unit within the existing Emergency Department at John Cochran, Building 1, Floor 01, including converting three rooms to the Observation Unit and renovating seven rooms to include relocated triage rooms and reception desk. Renovations will include phasing to maintain operations, walls, finishes, electrical, HVAC, plumbing, and medical gases. The base bid (CLIN 0001) has a period of performance of 550 calendar days. A Deduct Alternate 1 (CLIN 0002) excludes Door #7 at Room H132 and all associated equipment and work, with a period of performance of 500 calendar days.
We post new general contractors opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""66048""LEAVENWORTH""KS""USA""VA MEDICAL CENTER""4101 SOUTH 4TH STREET""AMENDMENT 36C25526R0162 0005.pdf"129168"file"".pdf""1""2026-10-08T20:49:18.978+00:00""344a1d82d5f847eb80f33ceaa2f3a66c""public""0""public""1ce02ab3e074430592b2410ddebe08b3""0"13"0""100 BID DOCUMENTS-FULL SET DRAWINGS 657-26-602.pdf"11070784"file"".pdf""1""2026-10-08T20:49:18.978+00:00""c4f57641b8fb4f87a0fd281180e8a041""public""0""public""3b8ff3845a784fd49eccbae558d99e99""0"12"0""REVISION 1 SPECIFICATIONS 657-26-602.pdf"6446766"file"".pdf""1""2026-10-06T21:31:51.544+00:00""ea064bea4d5441499b672bbf9d99c41c""public""0""public""d446c73709954aac833a0db3ed8e17d0""0"11"0""GOVERMENT RESPONSE TO RFIS 657-26-602JC.pdf"174447"file"".pdf""1""2026-10-06T21:31:51.544+00:00""7e3cc44d964a455a8d690b07ae8ef465""public""0""public""2c651bc47960406e9050402d8f3154ff""0"10"0""AMENDMENT 36C25526R0162 0004.pdf"129992"file"".pdf""1""2026-10-06T21:31:51.544+00:00""844e0f3610854b4d9c7e3677ffd23dea""public""0""public""7aca915336ad4086a437b313c3bf6935""0"9"0""36C25526R0162 AMENDMENT 0003.pdf"129408"file"".pdf""1""2026-09-23T22:11:41.337+00:00""01c8ba9b1b914685a2a5ed1a1c77ffc5""public""0""public""f6e02db4fadd407687a73fc784d84190""0"8"0""36C25526R0162 AMENDMENT 0002.pdf"228907"file"".pdf""1""2026-08-27T18:13:54.909+00:00""6d1aab898e3746539cd616cc685f2b47""public""0""public""eda9c1ca785c4edfb9a617b878370c89""0"7"0""REQUEST FOR INFORMATION TO GOVERMENT 657-26-602 REVISED.pdf"180823"file"".pdf""1""2026-08-14T15:31:11.416+00:00""708bf9ecf740472cba7c632158864b23""public""0""public""18235df098b6418392a198edb87a2461""0"6"0""SITE VISIT SIGN-IN SHEET 657-26-602JC.pdf"186065"file"".pdf""1""2026-08-14T02:34:11.968+00:00""fd1391dd363b4798a432f866f189ca5f""public""0""public""56e098302b81459fbde972a16c843ff4""0"5"0""36C25526R0162 AMENDMENT 0001.pdf"129292"file"".pdf""1""2026-08-14T02:34:11.968+00:00""7e8cd008f05c4528869a25518c7dd701""public""0""public""11a6fab68396479994e94bbe2e4fe95a""0"3"0""S02 ATTACHMENT COMBINED SPECS AND DRAWINGS 657-26-602.pdf"18738702"file"".pdf""1""2026-07-29T18:46:36.743+00:00""5b7cada79b494ae281bdaf770c82dfc8""public""0""public""c2ee1d7199f44211993b33a61825e8b8""0"2"0""S02 SOLICITATION 36C25526R0162_1.pdf"922454"file"".pdf""1""2026-07-29T18:46:36.743+00:00""ae1d3ad495e3433b8381331035459c5e""public""0""public""e8ce7d0beeba4c3e96938e1e6ac9b24f""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 122c8a052ac04110be8d9c3623ead189), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.