We'll email you new hvac opportunities in North Carolina as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
The contractor shall provide all material, labor, equipment and supervision to demolish nine water-to-air heat pumps, one water-to-water heat pump, one air handling unit, pumps and legacy DDC controls and to install nine new high-efficiency water-to-air heat pumps, a new water-to-water heat pump paired with a new air handling unit, new pumps, secondary drain pans, condensate piping, thermometers, a central BACnet supervisory controller with full DDC integration, flushed and chemically treated geothermal loop piping, independent testing adjusting and balancing, and electrical connections including specific breaker replacements, plus complete replacement of the 20-ton split-system AHU-1 and CU-1 serving Building HP259 with new ductwork connections, refrigerant and condensate lines and associated electrical and control systems while the facilities remain occupied.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""Amend 0001 27R9004 - Site Visit.pdf"883827"file"".pdf""1""2026-11-04T13:55:25.263+00:00""a8d16d82194443e08c54701e1548d5af""public""0""public""0eeb8705d0cb455cb01ab3f50f867864""0"9"0""25-0082 SOW.pdf"148777"file"".pdf""1""2026-10-30T18:45:19.551+00:00""175b0a2b792040d0a2fb2734ba729904""public""0""public""5a0357ad9120423ca1997cb6b7f4b69d""0"8"0""25-0063 SOW (4).pdf"75103"file"".pdf""1""2026-10-30T18:45:19.551+00:00""2ed972457805484f88e84ec75c8596ef""public""0""public""a5ac42c33e0e43a4835246b6b5b7af1c""0"7"0""N4008525B0082 Specs.pdf"6204721"file"".pdf""1""2026-10-30T18:45:19.551+00:00""5c226f0e109b415ca7b4ef0282ef9790""public""0""public""a89d00f4793c43eba59d48b9a6aff92d""0"6"0""N4008525B0082 Dwgs.pdf"5909188"file"".pdf""1""2026-10-30T18:45:19.551+00:00""eb1c34df67974967b7831feff15266d4""public""0""public""b86d959ea4fe41e4a42101cdca58ab8e""0"5"0""N4008525B0063 SpecSigned.pdf"6086465"file"".pdf""1""2026-10-30T18:45:19.551+00:00""84ec7ba5312342e386703121948cb44b""public""0""public""a5dfe8f7085b47fb8c3ebead9105ebc1""0"4"0""N4008525B0063 DwgSigned.pdf"10140902"file"".pdf""1""2026-10-30T18:45:19.551+00:00""aaab00c5421f4b93818b54171ab0b256""public""0""public""ea6c5e9290a04b8289b6a182f9e62af7""0"3"0""Pricing Sheet 27R9004.pdf"87159"file"".pdf""1""2026-10-30T18:45:19.551+00:00""ebc921ebfd3144d2991a59a99e98b3c7""public""0""public""651c46ad040f42c29bbcfb611ebe93ff""0"2"0""Mech MACC RFP 27R9004.pdf"220961"file"".pdf""1""2026-10-30T18:45:19.551+00:00""ec472b3e6abf49c7af769c4ce70eac08""public""0""public""7fc7be045d0a4e368e49590bf6f2216d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0f2a3d5c74ec43b7a90753a7ebb43676), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.