Pursuant NRS 338.1385, bids will be received at the Clark County School Contract, Procurement and Compliance,
1180 Military Tribute Place, Henderson, NV 89074 until Thursday, January 7, 2027, at 1:00 p.m., and then opened
and read aloud publicly for the furnishing of all labor and materials to perform the Work in conjunction with the
construction of:
Roof and HVAC Upgrade
Sierra Vista High School, MPID# 0018985, PWP# CL-2027-066
The Work consists of providing a new roof covering & associated roof components that include roof membrane,
protection board, rigid insulation, flashing, roof drain cover(s), sealants, curbs (where indicated), roof ladder
modifications, skylight replacement, roof hatch access replacement and associated roof components & details as
shown on drawings and specifications. Also included in the defined scope of work is the removal and
replacement of backer rod & sealant at exterior CMU wall control joints and exterior wall EIFS joints as shown
on drawings and specifications. The existing backer rod and sealant located at exterior wall openings at exterior
doors, windows, glazing systems, louvers and glass block locations are to be removed and replaced. Included in
the scope of work is the removal and replacement of existing HVAC equipment and components located in the
Central Plant Yard, Utility Rooms (Chiller Room & Boiler Room) and on top of Roof Deck and in Ceiling
Plenum as shown on drawings and specifications. Provide structural support for all replaced or modified
HVAC equipment and miscellaneous detail locations as shown on plans and specifications. Provide all
Plumbing and Electrical work as shown on plans and specifications.
The work consists of providing a new roof covering and associated roof components including roof membrane, protection board, rigid insulation, flashing, roof drain covers, sealants, curbs, roof ladder modifications, skylight replacement, and roof hatch access replacement. The scope includes removal and replacement of backer rod and sealant at exterior CMU wall control joints and exterior wall EIFS joints, as well as at exterior wall openings including doors, windows, glazing systems, louvers and glass block locations. HVAC work includes removal and replacement of existing equipment and components located in the Central Plant Yard, Utility Rooms (Chiller Room and Boiler Room), roof deck, and ceiling plenum, with provision of structural support for all replaced or modified HVAC equipment. All plumbing and electrical work as shown on plans and specifications is included.
We post new hvac opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Clark County School District Bids, retrieved via Clark County School District Facilities (Las Vegas, NV). View the official posting, and always confirm requirements and deadlines with the issuing agency.