This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 212321 - Construction Sand and Gravel Mining. The small business standard is No more than 500 employees. This acquisition is Firm Fixed Price. All responsible sources may submit a quotation which will be considered by the agency.
General Information:
1.0 Scope of Work
This project will develop the Champion Creek Pit for crushed aggregate surfacing material for use on forest roads. This work
includes all required clearing, grubbing, topsoil stripping, overburden removal, material processing/crushing, material
stockpiling, and restoration activities when finished. The Champion Creek Pit is located on the Sawtooth National Recreation
Area of the Sawtooth National Forest.
Project Location:
From the Sawtooth NRA Ranger Station, travel south along State Highway 75 for approximately 13.5 miles. Turn left on
Forest Road 70458, veer left, and continue about
IAW: Solicitation and all applicable specifications, attachments and any amendments
to include but not limited to;
A04_Section C Champion Pit Crushing
A04a_Schedule Of Items Section Champion Pit Crushing
A04b_FP14 Supplemental Specs Champion Pit Crushing
A04c_Design Drawings Champion Pit Crushing
A06_Fire Precautions Plan
Award Schedule:
Posting: 10/16/2026
Site Visit: 10/28/2026 @ 1300 MST
Q&A Due Date: 10/30/2026
Quotes Due Date: 11/05/2026
Anticipated Award Date: 11/16/2026
POP: 05/03/2027 – 06/30/2027 = 58 days
The project will develop the Champion Creek Pit for crushed aggregate surfacing material for use on forest roads. Work includes all required clearing, grubbing, topsoil stripping, overburden removal, material processing/crushing, material stockpiling, and restoration activities when finished. The base bid includes Mobilization (lump sum) and 20,000 cubic yards of Stockpiled Aggregates (Table 703-3), with an option for an additional 7,500 cubic yards in 500 CY increments. The contractor must also comply with Forest Service Supplemental Specifications, including weed prevention, fire precautions, and quality control requirements.
We post new chemicals & industrial supplies opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""81601""GLENWOOD SPRINGS""CO""USA""WHITE RIVER NATIONAL FOREST""900 GRAND AVENUE""Revision 1_ChampionPitCrushing.pdf"173404"file"".pdf""1""2026-11-02T20:18:04.315+00:00""d6f7e6ada2b34d699e0c9e62d392cd6a""public""0""public""577d7fd3c8a741b8b14abeafab2ccfd7""0"19"0""C04_SF1442_1240LT27Q0008 Rev1.pdf"832686"file"".pdf""1""2026-11-02T20:18:04.315+00:00""15a6316278204885bacd35121b9ee8d5""public""0""public""739085e4bf734778b2f872c781c4f844""0"18"0""C04_SF1442_1240LT27Q0008.pdf"390021"file"".pdf""1""2026-10-16T18:50:28.829+00:00""edb7f1c383e44e6a961c43d4edcd0cde""public""0""public""ef9fde3ee2d246d281bcf04fc4ff3508""0"17"0""C04a_ScheduleOfItems_SectionB_ChampionPitCrushing_1240LT27Q0008.docx"35366"file"".docx""1""2026-10-16T18:31:17.129+00:00""497354cc98bf4251b0181d4874828e9d""public""0""public""50f98afe48b44705a9ce793115d863ad""0"12"0""C04b_FP14SupplementalSpecs_ChampionPitCrushing_1240LT27Q0008.pdf"349038"file"".pdf""1""2026-10-16T18:31:17.129+00:00""8414ea53e6404ded804f0922dbccac39""public""0""public""239e736251b64e108f269b5262bc1625""0"10"0""C04c_DesignDrawings_ChampionPitCrushing_1240LT27Q0008.pdf"1161697"file"".pdf""1""2026-10-16T18:31:17.129+00:00""e4aeafae0f63444a81be13f390905a44""public""0""public""9cfcfc907d444a9d9912a4b29a56e642""0"7"0""C04d_DOL Wage Determination ID20260081_05182026_1240LT27Q0008.txt"14012"file"".txt""1""2026-10-16T18:31:17.129+00:00""9293311ecd6c46108ecc5a27feea9954""public""0""public""a781d86022c042aab3714ae54a694dee""0"4"0""C06_FirePrecautions Plan_1240LT27Q0008.pdf"119449"file"".pdf""1""2026-10-16T18:31:17.129+00:00""550c1e8de7b04cf0a485a20b35949e8d""public""0""public""5e9b63531cf34d9c8429ea4544aabd84""0"3"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 09c2f47bcf8b4daaba27d32b10e7756b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.