The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow.
A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.
This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.
Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.
The contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, taxes, fees, and perform all work necessary to complete the project in accordance with the drawings, specifications, and contract requirements. The work includes: full removal and replacement of the lift station for the Rosebud complex; demolition of the existing lift station consisting of the wet well, dry well, pumps and piping; construction of a new lift station consisting of a wet well, a dry well, installation of chopper pumps, and force main connection; installation of a new control system to allow the facility to monitor flow into the lift station and the status of the equipment; installation of approximately 20 feet of 12-inch sewer main and approximately 123 feet of 4-inch RJDI sewer force main; modifications to 1 existing manhole; and all associated site work, including concrete, fencing, electrical, and restoration.
We post new plumbing opportunities in South Dakota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20852""Rockville""MD""US""The Reyes Building 801Thompson Avenue, Suite 400""98121""SEATTLE""WA""USA""2201 6TH AVENUE""MAIL STOP RX-24""J07 Rosebud Comprehensive Health Care Facility Site Development - Utilities.pdf"22737609"file"".pdf""1""2026-10-27T20:25:06.572+00:00""28e22aee166f4995977d2cd11a02ec96""public""0""public""97f7c5d6e72d474e9115ebc222a98a1b""0"14"0""J06 Tribal Programs Sewer Branch.pdf"7409673"file"".pdf""1""2026-10-27T20:25:06.572+00:00""1d92c9b14fe64f8194898a245fb1202a""public""0""public""bbbda823b030476cb027f7a93222bc57""0"13"0""J02 Plans RLSC.pdf"6252789"file"".pdf""1""2026-10-27T20:25:06.572+00:00""096dabd149b7447ab1f61bcea862a6c4""public""0""public""9147641f15024111b5820406ba4a5b78""0"12"0""J03 Tech Specs RLSC.pdf"3491703"file"".pdf""1""2026-10-27T20:25:06.572+00:00""aede566461e84433843fa12c8abfb4fe""public""0""public""609f2d7d8b5e40e290acdac747646a08""0"11"0""J04 RB Geotech Report from 300 feet away.pdf"1064988"file"".pdf""1""2026-10-27T20:25:06.572+00:00""a2bb7e50134041d69142a38fbc624bd5""public""0""public""22ed3af3b0e64ec79ffa27473c174f55""0"10"0""Optional Company Specialized Experience Form.pdf"588044"file"".pdf""1""2026-10-27T20:25:06.572+00:00""348428942e4c4a0b9b00711b89c16a3d""public""0""public""a8150435fab84dbda049dbb12cd5bf46""0"9"0""J05 Existing-Proposed Lift Station Site Compared to the Former Solar Array.pdf"351677"file"".pdf""1""2026-10-27T20:25:06.572+00:00""c3b70246f5a84b05b2f45539a3a0ed85""public""0""public""3e0a25e10f054b99bdbff26913bf5218""0"8"0""J11 WH-347 Payrolls Exp 31Jan2028.pdf"304738"file"".pdf""1""2026-10-27T20:25:06.572+00:00""0e402b5b3552489f9eff4126401e2c4c""public""0""public""dc0621433c5046f68e9c43ea4c435951""0"7"0""B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf"748239"file"".pdf""1""2026-10-27T20:25:06.572+00:00""ee8c9c5efa15451a8fb80c3e9ebdb1ef""public""0""public""f1b4a43be3944ae3818a21b031368ea7""0"6"0""J01 SOW Rosebud Lift Station Construction.docx"34731"file"".docx""1""2026-10-27T20:25:06.572+00:00""ec57dba5fd7e4bd6b2869b5b59e68562""public""0""public""429c09ca71a840e8a39967650cfbf19b""0"5"0""J09 Self Performed Calculation Sheet.docx"28566"file"".docx""1""2026-10-27T20:25:06.572+00:00""e42874125aa64050af24597448e6c083""public""0""public""48f080ad5ac8476691826acee38fc5fe""0"4"0""Optional Past Performance Questionnaire.docx"30769"file"".docx""1""2026-10-27T20:25:06.572+00:00""18536cdaf1d04f8baf969141205bfe54""public""0""public""3fbdc39a7a654675b15c86b1f97438db""0"4"0""J10 Wage Det SD20260018 18May2026.pdf"63463"file"".pdf""1""2026-10-27T20:25:06.572+00:00""618b4ab6ec554d988515e73479ca48c7""public""0""public""aa5c0c8193f749709423a46ced6ea7fb""0"3"0""J12 Release of Claims.docx"14326"file"".docx""1""2026-10-27T20:25:06.572+00:00""493bf06fec124533b696404cb9ba3ef1""public""0""public""b5b9d6a26a7c461a8340d41a02574a31""0"2"0""J08 Block 17 Support Schedule RLSC.docx"30922"file"".docx""1""2026-10-27T20:25:06.572+00:00""56d3e91a7197406e958cd5e12c7653fb""public""0""public""4b3ba745678e4e57838a3ab4a848c4f6""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0645772ebbb24543b13eda13b37c9c20), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.