Light RFP
Federal · SAM.gov · Thomaston, CT

Electrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, Connecticut

Open — see notice·Electrical, Fencing, Bridge / InfrastructureView official posting ↗
Issuing agency
Department of Defense
Method
Presolicitation
Category
Construction · NAICS 238210
PIN
W912WJ26BA013
Location
Thomaston, CT
Posted
Jul 13, 2026
Takeaways by LightRFP AI
  • The U.S. Army Corps of Engineers, New England District is soliciting an Invitation for Bids (IFB) for Electrical Feeder Upgrades at Black Rock Lake Dam in Thomaston, Connecticut.
  • This procurement is a 100% Small Business Set-Aside with NAICS code 238210 and a size standard of $19M.
  • The estimated magnitude of the project is between $750,000 and $1,250,000.
  • The period of performance will be approximately 180 days.
  • The solicitation is planned to be issued in July 2026 and will be available online only via SAM.gov and PIEE.
  • Requirement: This solicitation is set aside for certified small businesses.

AI-generated, verify all details against the official documents.

Description

Black Rock Lake Dam, Thomaston, CT – Electrical Feeder Upgrades

The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000.

The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank.

The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset.

Please note that this solicitation is set aside for certified small businesses. This is not a request for proposals at this time; the solicitation requirements and contract documents which will include instructions for submission, and the response date will be available on or about July 2026. Neither telephonic, mailed, nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the USACE New England District. Additional questions may be emailed to the Contract Specialist at Kayla.Gonsalves@usace.army.mil. This notice does not commit the U.S. Government to contract for any supply or service.

Documents1
Pre-Solicitation Notice - Electrical Feeder Upgrades.pdfPDF

Contact

Name
Kayla Gonsalves
Phone
(978) 318-8256
Address
Thomaston, CT
Full source recordfrom SAM.gov
Type
Presolicitation
Title
Electrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, Connecticut
Active
Yes
Base Type
Presolicitation
Notice Id
031df9737dea45ce8b32f6202f45f988
Naics Code
238210
Department
DEPARTMENT OF DEFENSE
Posted Date
Jul 13, 2026
Categorized By
llm
Point Of Contact
Type
primary
Email
kayla.gonsalves@usace.army.mil
Phone
9783188256
Full Name
Kayla Gonsalves
Description Text
**Black Rock Lake Dam, Thomaston, CT – Electrical Feeder Upgrades** The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000. The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank. The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset. Please note that this solicitation is set aside for certified small businesses. This is not a request for proposals at this time; the solicitation requirements and contract documents which will include instructions for submission, and the response date will be available on or about July 2026. Neither telephonic, mailed, nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the USACE New England District. Additional questions may be emailed to the Contract Specialist at Kayla.Gonsalves@usace.army.mil. This notice does not commit the U.S. Government to contract for any supply or service.
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE ARMY.USACE.NAD.W2SD ENDIST NEW ENGLAND
Place Of Performance
City
Code
75730
Name
Thomaston
State
Code
CT
Name
Connecticut
Country
Code
USA
Name
UNITED STATES
Solicitation Number
W912WJ26BA013

Source: SAM.gov (notice 031df9737dea45ce8b32f6202f45f988), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.