The scope of this AOI encompasses planning, design, engineering, alteration, repair, and physical construction for airfield pavement assets and associated systems. Incidental civil, electrical, mechanical, utility, environmental, and site work directly supporting the primary airfield infrastructure is authorized and included within this scope. All facility types, infrastructure systems, technical specialties, and testing capabilities identified throughout this document are expressly illustrative and non-exhaustive, including but not limited to:
Horizontal airfield pavements and operating surfaces, including but not limited to runways, taxiways, aircraft parking aprons, arm/de-arm pads, compass swing bases, holding pads, alert pads, aircraft wash-rack pavements, access roadways, perimeter security paths, and all associated horizontal airfield pavements.
Airfield visual and electrical systems, including but not limited to runway edge and centerline lighting, threshold and end lighting, taxiway guidance lighting, approach lighting systems, precision approach path indicators (PAPIs), airfield signage, electrical duct banks, vault infrastructure, counterpoise grounding grids, automated Airfield Lighting Control and Monitoring Systems (ALCMS), mobile aircraft arresting systems (MAAS), and related navigational and visual aids.
Civil, drainage, and safety infrastructure, including but not limited to subsurface stormwater drainage networks, detention and retention basins, culverts, erosion and sediment control systems, aircraft arresting system foundations and containment vaults, blast deflectors, airfield perimeter security fencing, and related site-civil infrastructure.
Subsurface utility corridors and distribution, including but not limited to utility distribution pathways, aircraft grounding grids, communication ductways, fuel servicing distribution pathways supporting horizontal operations, and associated utility routing.
All other civil, geotechnical, electrical, safety, and operational horizontal airfield infrastructure elements necessary to meet mission requirements, regardless of whether specifically itemized above.
The scope encompasses planning, design, engineering, alteration, repair, and physical construction for airfield pavement assets and associated systems, including horizontal airfield pavements (runways, taxiways, aprons, etc.), airfield visual and electrical systems (lighting, signage, ALCMS, MAAS), civil/drainage/safety infrastructure (stormwater networks, detention basins, blast deflectors, fencing), subsurface utility corridors and distribution (utility pathways, grounding grids, communication ductways, fuel servicing distribution), and all other civil, geotechnical, electrical, safety, and operational horizontal airfield infrastructure elements necessary to meet mission requirements. Sample projects include repairs at Davis-Monthan AFB, Kirtland AFB, Laughlin AFB, Tinker AFB, Vance AFB, and Eareckson Air Station.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"78236-9861""JBSA LACKLAND""TX""USA""CP 210 395 8776""2261 HUGHES AVE BLDG 171 STE 163""MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx"42095"file"".docx""1""2026-11-17T13:43:43.483+00:00""3456cd3a9c54418bab022affcb468672""public""0""public""6b217394ee2e4b72bed2f4efaee2f37f""0"2"0""ATTACHMENT_1__PROJECT_LISTINGS.docx"38443"file"".docx""1""2026-11-17T13:43:43.483+00:00""558e7bf89a6c4ae1b11e692eff133f98""public""0""public""1f17db45cde145efac2d879ed1447e8e""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 75e5efdecd5e4638857b6e7828ade272), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.