We'll email you new generators opportunities in West Virginia as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The Department of Veterans Affairs (VA), Capital Region Readiness Center (CRRC) has a requirement for the maintenance of the CRRC. The facility is a 24/7/365 operation and as such maintaining the CRRC is critical to the readiness objective of the mission. The Contractor shall provide all labor, supplies, personnel, equipment, tools, materials, supervision and other items and services necessary for the monitoring, maintenance, and repair of building components, structures, emergency electrical power system, and the associated diesel fuel storage plant and fuel delivery and transfer components. All systems shall be maintained according to manufacturer’s recommendations for service level and interval.
*** September 3, 2026 - A SITE VISIT IS SCHEDULED FOR SEPTEMBER 8, 2026, AT 10:00AM.
*** September 3, 2026 - AN AMENDMENT IS FORTHCOMING
*** September 15, 2026 - QUOTE DUE DATE HAS BEEN EXTENDED, AMENDMENT IS STILL FORTHCOMING
*** September 29, 2026 - QUOTE DUE DATE HAS BEEN EXTENDED. AMENDMENT EXPECTED TO BE POSTED BY OCT 2, 2026.
*** October 2, 2026 - AMENDMENT POSTED (RFI responses, revised PWS, revised Solicitation, new Wage Determinations, Mix of Labor and LOE spreadsheet.
The Contractor shall provide all labor, supervision, coordination, tools, equipment, materials and services necessary to operate, monitor, maintain, repair and support mission-critical infrastructure including building components and finishes, HVAC and CRAH units, emergency generators and paralleling switchgear, electrical distribution, UPS and battery monitoring, SCADA and BMS controls, clean-agent fire suppression, fuel storage and delivery systems, plumbing, elevators, roofing, gates, docks and grounds, with preventive and corrective maintenance, testing, outage planning, 24/7 onsite staffing, CMMS tracking and reporting per manufacturer recommendations and applicable codes.
"US""21703""FREDERICK""MD""USA""5202 PRESIDENTS COURT""SUITE 103""AMENDMENT 0001 36C10X26Q0091 dtd 2 Oct 2026.pdf"653182"file"".pdf""1""2026-10-02T19:40:22.181+00:00""cba44c01f4c64fddb1f0b1cafa1b289c""public""0""public""86e6a68658284ec3b450280e1f79c405""0"66"0""SOLICIATION 36C10X26Q0091_27 Aug 2026.pdf"558299"file"".pdf""1""2026-08-27T18:48:58.304+00:00""826c499ab3d5470ea982d2e58df759da""public""0""public""8ace0ab7e2b3413ebc8f81e43fc780c4""0"63"0""ATTACHMENT A - PAST PERFORMANCE REFERENCES.pdf"134185"file"".pdf""1""2026-08-27T18:48:58.304+00:00""63264214a7b947809abf8bf891d14bf5""public""0""public""a69f11f251554df797d3b6820288a8fb""0"60"0""ATTACHMENT B - PAST PERFORMANCE QUESTIONNAIRE.pdf"203184"file"".pdf""1""2026-08-27T18:48:58.304+00:00""7a75c0464a0e4ae884ae4daf7cc38481""public""0""public""9cb4029d84cc4c2ebde08b2cee12d9d0""0"57"0""ATTACHMENT C - Performance Work Statement dtd 8 May 2026.pdf"971168"file"".pdf""1""2026-08-27T18:48:58.304+00:00""d16881f1e0a4462b867b1ccddc899f6f""public""2026-10-02T19:40:22.181+00:00""1""public""92642b67780c400e9253a4ad03bb044a""0"56"0""2026-10-02T19:40:22.181+00:00""ATTACHMENT C - Performance Work Statement revised 1 Oct 2026.docx"225139"file"".docx""1""2026-10-02T19:40:22.181+00:00""a79034044bb649dab56c9add6ba64d40""public""0""public""82d7845c67b34a7fa1d5ab9076bdb193""0"54"0""ATTACHMENT D - Wage Determination 2015-4297 dtd 22 Aug 2026.pdf"4451077"file"".pdf""1""2026-10-02T19:40:22.181+00:00""3872b0eb2bb145e99259d316a86c3bbe""public""0""public""4dc05abaa94341a8959a5111b855d822""0"52"0""ATTACHMENT E - Wage Determination 2015-4285 dtd 22 Aug 2026.pdf"4453711"file"".pdf""1""2026-10-02T19:40:22.181+00:00""d868f6f496aa47a88f050ed2370bbdf6""public""0""public""ee1be513cc2a45a9831d5e541e964aae""0"50"0""ATTACHMENT D- Wage Determination 2015-4297 dtd 13 May 2026.pdf"4454520"file"".pdf""1""2026-08-27T18:48:58.304+00:00""7f74308d7f704e26b1be038ab6bd61c8""public""2026-10-02T19:40:22.181+00:00""1""public""42c09edc1a064746a22bd030a0cd18b7""0"16"0""2026-10-02T19:40:22.181+00:00""ATTACHMENT F - Mix of Labor and Level of Effort.xlsx"26822"file"".xlsx""1""2026-10-02T19:40:22.181+00:00""b6dd8065a08543fe8eae31d23d4fa81d""public""0""public""41d562efaae04d5d9dd9c2e331b75ff9""0"14"0""QUESTIONS CRRC RFI 1 Oct 2026.pdf"187436"file"".pdf""1""2026-10-02T19:40:22.181+00:00""4033407e1c1343149fdb6bf8be8a867b""public""0""public""02c960d5ae7d42f58e8f1a5be2920ff5""0"13"0"Most West Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 018b7b24ef45448d857db4db1052406a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.