Richmond erosion & sediment bonds.
From $125. Enter your amount.

Before issuing a land-disturbance permit, the City of Richmond's Department of Public Utilities can require a performance bond guaranteeing your erosion and sediment control measures. Premiums run 2% of the bond amount plus a $25 fee, $125 minimum, and pricing runs through a soft credit check only — never a hard inquiry.

Required by the City of Richmond before a land-disturbance permit is issued
Amount set by the City — the estimated cost to install and maintain conservation measures
Soft credit pull only — never affects your score, and your exact price appears at the application
2% + $25 fee$125 minimumInstantprice at applicationSoft pullnever affects score
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Three steps to permitted.

Your land-disturbance permit is waiting on this bond. Here is the whole process — no broker phone tag:

TODAY · ONLINE

Apply once, online

Business details, the bond amount the City required, and the effective date — plus a one-time consent to a soft credit pull.

WITHIN 48 HOURS

Reviewed & approved

Most clear quickly; if underwriting needs anything, you hear from an underwriter within 48 hours. The credit check is a soft pull that never affects your score.

1–2 BUSINESS DAYS

File with the City of Richmond

Pay online and receive the executed bond, ready to file with the City to release your land-disturbance permit. Wet-ink originals mailed when the City insists.

About this bond

What it is and who needs it.

What the erosion and sediment control bond covers

The City of Richmond administers erosion and sediment control for construction projects under its City Code and Virginia's erosion-control law. Before issuing a land-disturbance permit, the City can require a performance bond so the conservation work is completed even if the permit holder defaults.

The bond guarantees you will install and maintain the approved conservation measures — silt fence, sediment basins, stabilization — through the life of the project. If you fail to, the City can draw on the bond to take corrective action at your expense.

Under Virginia law, the bond amount cannot exceed the estimated cost to initiate and maintain the conservation measures, plus a reasonable allowance for administrative costs and inflation (capped at 25% of the estimated cost). We issue the amount the City sets; premiums start from $125, priced through a soft credit check only.

City of Richmond — land-disturbance permit; Va. erosion-control lawThe City of Richmond requires this performance bond before issuing a land-disturbance permit, under its City Code and the Virginia Erosion and Sediment Control Law (Va. Code Title 62.1, Ch. 3.1). The bond amount cannot exceed the estimated cost to initiate and maintain conservation measures plus a reasonable administrative/inflation allowance (not more than 25% of that cost). Confirm the amount with the City of Richmond.

You need this bond if you are

A site developer or builder pulling a land-disturbance permit in the City of Richmond
A grading or excavation contractor responsible for erosion and sediment control on a site
Subdividing or clearing land that triggers a City land-disturbance permit
Doing infill or redevelopment the City requires to bond its conservation measures

One application, issued instantly.

These are the actual underwriting fields, including a one-time consent to a soft credit pull. Submit once and your bond is typically issued within 1–2 business days.

Start the application →
FAQ

Common questions.

How much is the Richmond erosion and sediment control bond?Premiums are 2% of the bond amount plus a $25 fee, $125 minimum. The amount is set by the City of Richmond from the estimated cost to install and maintain your conservation measures, and your exact price appears at the application.
How is the bond amount determined?Virginia law ties it to the estimated cost to initiate and maintain the erosion and sediment control measures, plus a reasonable allowance for administrative costs and inflation, capped at 25% of that estimate. The City of Richmond sets the final figure on your permit.
Is there a credit check?Yes — a quick soft credit pull, which never affects your score and is never a hard inquiry. It is the only extra step beyond the application; your price is set at 2% of the bond amount plus a $25 fee, $125 minimum, regardless of credit.
What does the bond guarantee?That you install and maintain the approved erosion and sediment control measures through the project. If you default, the City can draw on the bond to complete the work — and if the surety pays, you repay the surety.
When does it release?The City releases the bond once the site is stabilized and the conservation measures are accepted, typically at project completion or after the maintenance period. We track expirations and notify you ahead of any renewal.
Related bonds

Other Virginia bonds.

The City of Richmond is waiting on one document.

From $125, short application, e-signed bond in 1–2 business days. Free until issued.

Your premiumfrom $125
Apply now →