Sandy City excavation bonds.
Flat 3%. Enter your amount.

Before Sandy City issues a road-cut or excavation permit, it requires a bond guaranteeing you'll restore any street, curb, or sidewalk you disturb. The city sets the amount; we issue it at a flat 3%, $275 minimum, with no credit check.

Required by Sandy City Public Works before it issues an excavation / road-cut permit
Amount set by the city — often tied to the cost of restoring the affected area
Flat 3%, no credit pull — enter the required amount and the premium updates
Flat 3%of your bond amount$275minimum premiumNo creditcheck to issue
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

No underwriting queue for the standard excavation bond — enter your amount, pay, and file with Sandy City. Here is the whole thing:

TODAY · 5 MINUTES

Apply online

Your business details, the bond amount the city required, and the effective date — that is the entire application.

INSTANTLY

Issued on the spot

No credit check and no waiting — the executed bond is generated as soon as you pay. Larger amounts may get a quick review.

SAME DAY

File with Sandy City

Submit the executed bond with your Sandy City excavation / road-cut permit application. Wet-ink originals mailed whenever the city insists on them.

The whole pricing page.

Bond amount × 3% = your premium, one-time, $275 minimum. Enter the figure on your Sandy City permit and the premium updates.

$5,000 bond
$275
$10,000 bond
$300
$25,000 bond
$750
About this bond

What it is and who needs it.

What the excavation bond covers

An excavation permit bond is a restoration guarantee. When you cut into a Sandy City street or right-of-way, the city wants assurance that the road, curb, or sidewalk will be restored to specification — and that it can recover the cost if you don't.

It's a three-party arrangement: you (the principal), the surety carrier, and Sandy City (the obligee). If the work is incomplete, defective, or damages public property you don't repair, Sandy City can claim against the bond to cover restoration.

We issue the amount Sandy City set, at a flat 3% with no credit check, ready to file with your road-cut permit. Sandy City requires the bond uniformly as a condition of the excavation permit.

Sandy City — excavation / road-cut permit (Public Works)Sandy City requires this bond as a condition of its excavation / road-cut permit; Utah Code § 10-8-84 authorizes Utah municipalities to regulate work in public rights-of-way and to require a permit bond. The bond amount is set by Sandy City Public Works — confirm the required amount on your permit.

You need this bond if you are

A contractor cutting or trenching a Sandy City street under a road-cut permit
Installing or repairing utilities within the Sandy City right-of-way
A utility or telecom doing excavation inside Sandy City limits
Renewing an excavation permit whose bond lapsed or was non-renewed

Five minutes, issued on the spot.

Submit the application with the bond amount Sandy City set — the executed bond is generated instantly, ready to file.

Start the application →
FAQs

Common questions.

If yours isn't here, the bond team can usually answer within the hour.

How much is the Sandy City excavation bond? +
The premium is a flat 3% of the bond amount, with a $275 minimum. The amount itself is set by Sandy City — generally tied to the cost of restoring the area you disturb. Enter the figure on your permit and the quote updates.
Do I pay the full bond amount? +
No. You pay the premium — 3% of the bond, $275 minimum. The bond amount is the surety's maximum liability if the city makes a valid claim, not a deposit.
Is there a credit check? +
No — the excavation bond is issued with no credit pull. Larger bond amounts may get a quick soft-pull review, which never affects your score.
Where do I file it? +
With Sandy City Public Works, alongside your excavation / road-cut permit application. We issue the executed bond ready to submit.
When does it renew? +
Terms run 1, 2, or 3 years. The bond stays active for your permit window; we send renewal notices 60 and 30 days out, with autopay available.
Related bonds

Other New York bonds.

Excavation bond, issued today.

Five-minute application, flat 3%, $275 minimum. Enter the amount the city set and file the same day.

Your premium @ 3%$300
Apply now →