Provo excavation permit bonds.
From $100. Enter your amount.

Before Provo City issues a permit to excavate or cut into its right-of-way, it requires a surety bond. Provo sets the amount by the scope of the work, so there is no single figure — the premium is 1% of the bond amount, with a $100 minimum. Your exact price appears at the application.

Required by Provo City before an excavation / right-of-way permit is issued
Amount set by the scope of your excavation — Provo sizes it per project
1% of the bond amount — $100 minimum; exact price at application
1% of bond amount$100 minimumNo credit reviewnot even a soft pullFastinstant underwriting
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

Most standard excavation permit bonds move fast — enter your amount, pay, and file with Provo City. Here is the whole thing:

TODAY · ONLINE

Apply online

Your business details, the bond amount Provo required, and the effective date — that is the entire application.

INSTANTLY, USUALLY

Issued on the spot

Most applicants are issued the executed bond as soon as they pay. If a check is needed, it is a soft pull that never affects your credit score, and larger amounts may get a quick review.

SAME DAY

File with Provo City

Submit the executed bond with your Provo City excavation permit. Wet-ink originals mailed whenever the city insists on them.

About this bond

What it is and who needs it.

What the excavation bond actually covers

A Provo City excavation permit bond is a restoration guarantee. When you open Provo pavement to lay or repair utilities and then backfill, the city wants assurance you will restore the street and surface to its standards and not leave a failing patch.

It is a three-party arrangement: you (the principal), the surety carrier, and Provo City (the obligee). If your excavation or restoration fails to meet permit conditions, the city can recover the cost of repair against the bond.

Because Provo sizes the bond by the scope of the work, there is no single statutory figure — enter whatever amount your permit names and we show you the exact premium: 1% of the bond amount, with a $100 minimum.

Provo City — Public Works / Engineering (excavation permit)Provo City requires a surety bond as a condition of an excavation / pavement-cut permit in the public right-of-way; the amount is set by the city through its Public Works and engineering permit process, generally scaled to the scope of the work. Confirm the exact bond amount on your Provo City permit.

You need this bond if you are

A contractor pulling a Provo City excavation permit to cut into city pavement
Installing or repairing utilities that require opening the Provo right-of-way
Making a water, sewer, or gas connection that crosses a Provo public street
Renewing an existing excavation bond that is expiring or was non-renewed

One application, issued on the spot.

Submit the application with the bond amount Provo City set — the executed bond is generated instantly, ready to file.

Start the application →
FAQ

Common questions.

How much is the Provo City excavation permit bond?The premium is 1% of the bond amount, with a $100 minimum. Provo City sets the amount by the scope of your work — enter the figure on your permit and your exact price appears at the application.
How does Provo set the bond amount?Provo sizes the excavation bond to the scope of the right-of-way work. There is no single statutory figure — your permit will state the amount required, and you enter that.
Is there a credit check?Most applications approve instantly. If a check runs, it's a soft pull only — never a hard inquiry, and it never affects your credit score. Larger bond amounts may get a quick soft-pull review for the same reason.
Do I pay the full bond amount?No. You pay the premium, which is 1% of the bond amount with a $100 minimum. The bond amount is the surety's maximum liability if Provo makes a valid claim, not a deposit.
Where do I file it?With Provo City — submit the executed bond with your excavation / right-of-way permit through the Public Works and engineering permit process.
Related bonds

Other Utah bonds.

Provo excavation bond, issued today.

1% of the bond amount, $100 minimum. Enter the amount Provo required and see your exact price.

Your premiumfrom $100
Apply now →