Before the City of Dallas, TX issues a permit to move a house or structure within the city, its Building Inspection Division requires a house/structure moving rehabilitation bond attached to the moving permit application, sized to the move. Pricing is 0.5% of the bond amount, with a $100 minimum. The bond issues the moment you pay — no credit review of any kind, not even a soft pull.
















No underwriting queue for the standard moving rehabilitation bond — enter your amount, pay, and file with the moving permit application. Here is the whole thing:
Your business details, the bond amount Building Inspection set for the move, and the effective date — that is the entire application.
The bond issues the moment you pay — no credit review of any kind, not even a soft pull.
Attach the executed bond to your moving permit application, alongside the route approval, site plan, and foundation plan the checklist requires. Wet-ink originals mailed whenever the office insists.
When a house or other structure is moved within the City of Dallas, TX, the Building Inspection Division's Moving Permit Application Checklist lists a house/structure moving rehabilitation bond as a required attachment, alongside the route approval, site plan, and foundation plan for the new location. The bond stands behind restoring the vacated site — clearing the lot and leaving it in the condition the city requires — once the structure is gone.
It is a three-party arrangement: you (the principal), the surety carrier, and the City of Dallas (the obligee), protecting the city and neighboring property from an abandoned, unrestored lot. If the site is not cleared and rehabilitated as required and the city has to step in, the city can recover its cost against the bond.
It is not insurance for you — if the surety pays a claim, you repay the surety. This bond is separate from the mover's own $5,000 annual building-mover's license bond (Dallas Building Code § 3702.3) — that one licenses the moving business itself; this one is filed on each individual move. We price it at 0.5% of the bond amount, with a $100 minimum, and the application collects no credit information.
These are the actual issuing fields — the application collects no credit information, because this bond does not need one.
Start the application →Pricing from $100. Enter the amount Building Inspection set for your move and file with your permit application. Free until issued.