Columbus stormwater BMP bonds.
$100 flat.

The City of Columbus requires a $10,000 stormwater BMP construction bond, filed with its Department of Public Utilities, to guarantee that stormwater best management practices are built to the approved plans. Ours is $100 flat, with a quick soft credit check that never affects your score. Columbus requires an original bond with live signature and seal.

Required by the City of Columbus Department of Public Utilities for stormwater BMP construction
Fixed amount, fixed price — $10,000 bond, $100, no quote theater
Soft credit pull only — never affects your score, and the price stays $100 either way
A-ratedA.M. Best carriersInstantissued the moment you payOriginalbond mailed
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Three steps to filed.

Your stormwater approval is waiting on this bond. Here's the process — and note Columbus wants the wet-ink original:

TODAY · ONLINE

Apply once, online

Business details, owner information, mailing address, and effective date — plus a one-time consent to a soft credit pull.

WITHIN 48 HOURS

Reviewed & approved

Most of these clear quickly; if underwriting needs anything, you hear within 48 hours. The credit check is a soft pull that never affects your score.

1–2 BUSINESS DAYS

Original bond mailed to you

The City of Columbus requires an original bond with live signature and impression seal — we mail it to your address. Sign it as Principal before filing it with the Department of Public Utilities.

About this bond

What it is and who needs it.

What the bond actually guarantees

The City of Columbus requires a $10,000 stormwater BMP construction bond before stormwater best management practices (BMPs) are built, filed with its Department of Public Utilities. It is a construction-completion guarantee: it stands behind your obligation to build the stormwater BMPs to the approved plans and specifications.

It's a three-party arrangement: you (the principal), the surety carrier, and the City of Columbus (the obligee). If the BMPs aren't built per the approved plans, the city can recover against the bond to complete or correct the work.

It is not insurance for you — if the surety pays a claim, you repay the surety. Note that Columbus requires the original bond with a live signature and impression seal, so we mail the wet-ink original; sign it as Principal before filing.

City of Columbus Department of Public UtilitiesThe City of Columbus requires a $10,000 stormwater BMP construction bond as a condition of constructing stormwater best management practices, filed with the Department of Public Utilities; the bond amount and terms are set by the City of Columbus. Columbus requires an original bond with live signature and impression seal — confirm your scope and amount with the Department of Public Utilities.

You need this bond if you're

A site or civil contractor building stormwater BMPs on a Columbus development
A developer or builder whose plan includes stormwater best management practices
An excavation contractor constructing detention, retention, or water-quality BMPs
Filing with the DPU for a project the city conditions on a BMP construction bond

One application, issued instantly.

These are the actual underwriting fields, including a one-time consent to a soft credit pull. The City of Columbus requires the original bond mailed with live signature and seal.

Start the application →
FAQ

Common questions.

How much is the Columbus stormwater BMP bond?The premium is $100, set by our carrier for this $10,000 bond — the same for every contractor. There is no quote process.
Do I pay the $10,000?No. You pay $100. The $10,000 is the surety's maximum liability if the city makes a valid claim against the bond — not a deposit, and nobody holds your money.
Is there a credit check?Yes — one soft credit pull, which never affects your score. It informs approval, not price: the price stays $100 either way.
Why do I get a paper original?The City of Columbus requires an original bond with a live signature and impression seal — an e-signed PDF is not accepted. We mail you the wet-ink original; sign it as Principal before filing it with the Department of Public Utilities.
What's the difference between this and the SCP bond?Both are $10,000 Columbus stormwater bonds filed with the Department of Public Utilities. The BMP bond covers stormwater best management practices broadly; the SCP bond covers stormwater control practice construction. Check which your DPU approval names — or send it to us and we’ll confirm.
Related bonds

Other Ohio bonds.

The DPU is waiting on one document.

$100 flat, short application, original bond mailed in 1–2 business days. Free until issued.

Your price$100
Apply now →