Lafayette street-cut bonds.
$300. Five minutes.

The City of Lafayette requires a $10,000 bond for right-of-way permits that involve street cuts or excavations — work that opens up a city street or alley. Our premium is $300 flat (3% of $10,000), and the application is five minutes.

Required for Lafayette right-of-way permits with street cuts or excavations — and for oversize vehicles
$10,000 fixed — the city sets this amount for excavation in the right-of-way
No credit check on this bond — fixed-amount permit bond
A-ratedA.M. Best carriersFastoften same purchase1–3 yrterms available
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Three steps. One sitting.

Right-of-way permit bonds are simple. Here's the entire process:

NOW · 5 MINUTES

Apply online

Business details and an effective date. That's the application — no financials, no credit section.

MINUTES, USUALLY

Pay & e-sign

Fixed-amount permit bonds like this typically issue right after purchase. At most, 1–2 business days.

SAME DAY

File with the City of Lafayette

Your executed bond and power of attorney arrive by email, ready to file with the City of Lafayette engineering / right-of-way office with your permit. Wet-ink original mailed on request.

The whole pricing page.

$10,000 bond × 3% = $300, one-time per term. Fixed amount, fixed price, multi-year if you want it.

1-year term
$300
2-year term
$600
3-year term
$900
About this bond

What it is and who needs it.

What the bond actually guarantees

A street-cut bond is a restoration guarantee. When you open the City of Lafayette right-of-way to cut a street or excavate, the city wants assurance the pavement, curb, and surface are restored to its standard once the work is done.

It's a three-party arrangement: you (the principal), the surety carrier, and the City of Lafayette (the obligee). If you leave the cut unrestored or the patch fails and you don't fix it, the city can recover the repair cost against the bond.

The city sets $10,000 for right-of-way permits involving street cuts, excavations, or oversize vehicles. The bond must be on file before the permit is issued, so we keep it current and notify you 60 and 30 days out.

City of Lafayette — Right-of-Way PermitsThe City of Lafayette requires a $10,000 bond for right-of-way permits involving street cuts, excavations, or oversize vehicles, naming the City of Lafayette as obligee. The bond amount and permit terms are set by the City of Lafayette engineering / right-of-way office per its license and bond requirements; confirm current requirements with that office.

You need this bond if you're

Pulling a Lafayette right-of-way permit that involves a street cut or excavation
A utility or excavation contractor opening city pavement to lay or repair infrastructure
Moving an oversize vehicle or load that the city requires a bonded permit for
Renewing your bond so your right-of-way permit stays in good standing

Five minutes. The whole thing.

These are the actual issuing fields — no credit section, because this bond doesn't have one.

Start the application →
FAQs

Common questions.

If yours isn't here, the bond team can usually answer within the hour.

How much is the Lafayette street-cut bond? +
The premium is $300 — a flat 3% of the fixed $10,000 bond, the same for every contractor. The $10,000 is set by the City of Lafayette, so there is no quote process.
Do I pay the $10,000? +
No. You pay $300. The $10,000 is the surety's maximum liability if a valid claim is made against the bond — not a deposit, and nobody holds your money.
How fast will I have the bond? +
Fixed-amount permit bonds like this usually issue right after purchase — many contractors finish the application and have the bond the same sitting. At most, 1–2 business days.
Is there a credit check? +
Not on this bond — the application has no credit section. Fixed-amount permit bonds this size don't need one.
Where do I file it? +
With the City of Lafayette engineering / right-of-way office, alongside your right-of-way permit application. We mail wet-ink originals on request.
Related bonds

Other New York bonds.

Pull your Lafayette street-cut permit today.

$300 flat, five-minute application, bond often issued in the same sitting. Free until issued.

Your premium @ 3%$300
Apply now →