Poplar Grove right-of-way bonds.
1% of the bond amount.

Boone County's Village of Poplar Grove requires a right-of-way bond before certain permits are issued — work that opens, excavates, or otherwise affects the public right-of-way, from a utility tie-in to a new driveway apron. The Village sets the bond amount per permit; ours costs 1% of the bond amount, $100 minimum, priced at application.

Required for permits affecting the public right-of-way in the Village of Poplar Grove
The Village Building Department or Public Works sets the amount for your specific permit — confirm before applying
From $100, priced at application — enter the amount your permit calls for
From $1001% of the bond amount, $100 minimumNo credit fieldsin the applicationFastinstant underwriting for most
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

Right-of-way bonds are simple to issue once you know the amount your permit requires. Here is the whole thing:

TODAY · ONLINE

Apply online

Your details, the work you're performing, the obligee (Village of Poplar Grove), the bond amount your permit calls for, and the effective date.

USUALLY MINUTES

Approved

This application collects no credit information, so most applicants approve instantly. Pricing is 1% of the bond amount, $100 minimum.

SAME DAY

File with the Village

Your executed bond and power of attorney arrive by email, ready to file with your right-of-way permit application. Wet-ink original mailed on request.

About this bond

What it is and who needs it.

What the right-of-way bond actually guarantees

A right-of-way bond protects the Village of Poplar Grove and the traveling public from the cost of restoring streets, curbs, sidewalks, and other public right-of-way disturbed by a permitted project. Before issuing a right-of-way permit, the Village can require the applicant to post a bond guaranteeing the work will be completed to Village standards and the right-of-way properly restored.

It's a three-party arrangement: you (the principal), the surety carrier, and the Village of Poplar Grove (the obligee), with the public right-of-way and nearby property owners as the protected interest. If restoration work is left unfinished or done improperly, the Village can draw on the bond to complete it.

It is not insurance for you — if the surety pays a claim, you repay the surety. There is no single published bond amount for every project; the Building Department or Public Works sets the figure based on the scope of the permitted work, so confirm your number with Village Hall (815-765-3201) before applying.

Village of Poplar Grove — Building Department / Public WorksThe Village of Poplar Grove requires a right-of-way bond as a condition of certain permits for work performed within or affecting the public right-of-way. The Village sets the required bond amount on a per-permit basis; a specific municipal code section number for this requirement was not independently verifiable at publication, so confirm the amount and any code citation directly with Village Hall before applying.

You need this bond if you're

Opening a trench or excavating within the Poplar Grove public right-of-way
Installing or tying into a utility line that crosses Village right-of-way
Building or replacing a driveway apron or curb cut onto a Village street
Performing any permitted work the Village has flagged as requiring a right-of-way bond

One application, issued instantly.

These are the actual issuing fields. The application collects no credit information, so your bond amount is what mainly drives your price.

Start the application →
FAQ

Common questions.

What amount should I enter?The amount your Poplar Grove right-of-way permit specifies. The Village Building Department or Public Works sets the figure per project — if you don't have it in hand, call Village Hall at 815-765-3201 before applying.
What does the bond guarantee?That work affecting the public right-of-way — excavation, a utility tie-in, a new driveway apron — gets restored to Village standards. If restoration is left unfinished, the Village can draw on the bond to complete it.
Where do I file it?With the Village of Poplar Grove, typically alongside your right-of-way permit application through Village Hall or the Building Department. Your e-signed bond arrives by email, ready to attach.
Do I pay the full bond amount?No. You pay 1% of the bond amount, $100 minimum. The bond amount itself is the surety's maximum liability if a valid claim is made — not a deposit, and nobody holds your money.
Is there a credit check?The application collects no credit information, so most applicants approve instantly. If a check ever runs on this bond, it's a soft pull that won't affect your score.
Related bonds

Other Illinois bonds.

Get your right-of-way permit moving.

From $100, priced at application. Enter your amount and file with the Village the same day.

Your premiumfrom $100
Apply now →