MWRD right of way permit bonds.
From $100. Enter your amount.

Before a contractor or developer builds a sewer connection, crosses, or otherwise disturbs land within the right of way of the Metropolitan Water Reclamation District of Greater Chicago (MWRD) — the special district created under the Metropolitan Water Reclamation District Act, 70 ILCS 2605, serving most of Cook County — its Engineering Department requires surety on the permit sized to the cost of the work. Premiums cost 1% of the bond amount, $100 minimum. Enter the amount your permit calls for and your exact price appears at the application.

Required by MWRD's Engineering Department before right-of-way or sewer-connection work proceeds
Amount is tied to the construction cost of the work as submitted with the permit application, per MWRD practice
From $100 — MWRD's permit desk confirms your required amount; your exact price appears at application
From $1001% of the bond amount, $100 minimumSoft pullnever affects your scoreFastinstant underwriting for most
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

The surety itself is a short, standard-form obligation. Enter your amount, consent to a soft pull, and file with MWRD. Here is the whole thing:

TODAY · ONLINE

Apply online

Your details, the permit or project reference, the bond amount MWRD set, and the effective date — plus a one-time consent to a soft credit pull.

USUALLY MINUTES

Approved

Most right-of-way permit bonds clear quickly on the soft pull, which never affects your score — pricing is 1% of the bond amount, $100 minimum.

SAME DAY

File with MWRD

Your executed bond arrives by email, ready to submit with your Engineering Department permit application. Wet-ink originals mailed on request.

About this bond

What it is and who needs it.

What the MWRD right of way bond actually guarantees

A right of way permit bond is a restoration and compliance guarantee. The Metropolitan Water Reclamation District of Greater Chicago, the special district organized under the Metropolitan Water Reclamation District Act, 70 ILCS 2605, controls a right of way and a sewer system across most of Cook County, and its Engineering Department conditions a permit to build, cross, or connect to that system on surety backing the work.

It is a three-party arrangement: you (the principal), the surety carrier, and MWRD (the obligee). The bond backs your promise to complete the permitted work to MWRD's standards, restore any surface improvements disturbed by construction, and cover the district's costs if the work damages its infrastructure or is left unfinished. If MWRD suffers a loss tied to the permitted work, it can draw on the bond — and if the surety pays, you repay the surety.

MWRD does not publish a single flat bond figure — the amount is set, project by project, to the construction cost of the permitted work plus an allowance for surface restoration, and it can be adjusted for inflation on a renewal. Enter the amount your Engineering Department contact confirms; your premium is priced from a $100 minimum after a quick soft credit check that never affects your score.

MWRD Engineering Department · 70 ILCS 2605The Metropolitan Water Reclamation District of Greater Chicago is organized under the Metropolitan Water Reclamation District Act, 70 ILCS 2605, and its Engineering Department administers permits for work within the district's right of way and connections to its sewer system, including surety requirements sized to the construction cost of the permitted work. MWRD's own program materials describe the required security as set to the nominal cost of the work plus a factor for surface restoration, updated as new work is added to an existing permit. Confirm your specific bond amount and permit conditions directly with MWRD's Engineering Department before you apply.

You need this bond if you are

A contractor or developer building a sewer connection or crossing that touches MWRD right of way
A utility or municipality installing infrastructure that disturbs land MWRD controls
A principal whose Engineering Department permit is conditioned on posting surety before work begins
A permit holder adding new work to an existing permit, where MWRD has recalculated the required amount

One application, issued instantly.

These are the actual underwriting fields, including a one-time consent to a soft credit pull. The pull never affects your score, and your price — from a $100 minimum — is set at application.

Start the application →
FAQ

Common questions.

How much is the MWRD right of way permit bond?Premiums cost 1% of the bond amount, with a $100 minimum. The amount itself is set by MWRD's Engineering Department, typically to the construction cost of the permitted work plus a restoration allowance — there is no single flat figure. Enter the amount your permit confirms and your exact price appears at the application.
What amount should I enter?The bond figure MWRD's Engineering Department confirmed on your right-of-way or sewer-connection permit. If you have not yet been given a figure, contact your MWRD permit reviewer before you apply for the bond.
What does the bond guarantee?It guarantees you will complete the permitted work to MWRD standards and restore any surface improvements disturbed by construction. If MWRD suffers a loss tied to the work, it can claim against the bond.
Do I pay the full bond amount?No. The bond amount is MWRD's coverage limit if a claim is made against you, not your cost. You pay only the premium — 1% of the bond amount, $100 minimum.
Is there a credit check?The application includes a credit consent, but it authorizes a soft credit pull only — a soft inquiry that never affects your score. No hard inquiry ever runs on this bond.
Related bonds

Other Illinois bonds.

Get the permit bonded, not delayed.

Premiums from $100, soft pull only. Enter the amount MWRD set and file the same day.

Your premiumfrom $100
Apply now →