Bradley excavation permit bonds.
From $100. Enter your amount.

Before excavating in a public street, sidewalk, or right-of-way inside the Village of Bradley, the Village's Building Services division conditions the excavation permit on a surety bond sized to the scope of the work. Premiums cost 1% of the bond amount, $100 minimum. Enter the amount your permit calls for and your exact price appears at the application.

Required by Village of Bradley Building Services before an excavation permit is issued
Backs the promise to restore the street, sidewalk, or right-of-way once the excavation is closed
From $100 — Building Services confirms your required amount; your exact price appears at application
From $1001% of the bond amount, $100 minimumSoft pullnever affects your scoreFastissued the same day for most permits
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

The bond itself is a short, standard-form obligation. Enter your amount, consent to a soft pull, and file with the Village. Here is the whole thing:

TODAY · ONLINE

Apply online

Your details, the excavation location, the bond amount Building Services confirmed, and the effective date — plus a one-time consent to a soft credit pull.

USUALLY MINUTES

Approved

Most excavation permit bonds clear quickly on the soft pull, which never affects your score — pricing is 1% of the bond amount, $100 minimum.

SAME DAY

File with the Village

Your executed bond arrives by email, ready to attach to your excavation permit application at the Building Services counter. Wet-ink originals mailed on request.

About this bond

What it is and who needs it.

What the excavation permit bond actually guarantees

An excavation permit bond is a restoration guarantee. The Village of Bradley requires a permit before anyone digs in a public street, sidewalk, or right-of-way, and Building Services conditions that permit on a surety bond that backs the promise to properly backfill, compact, and restore the surface once the work is done.

It is a three-party arrangement: you (the principal), the surety carrier, and the Village of Bradley (the obligee). If an excavation is left improperly backfilled, the pavement or sidewalk is damaged, or the Village has to complete the restoration itself, it can draw on the bond — and if the surety pays, you repay the surety.

There is no single villagewide penal sum — Building Services sets the amount on each permit based on the scope and location of the dig. Enter the figure your permit shows; your premium is priced from a $100 minimum after a quick soft credit check that never affects your score.

Village of Bradley Building ServicesThe Village of Bradley requires building permits, including excavation work in public streets, sidewalks, and rights-of-way, to be reviewed and issued by the Village's Building Services division, which conditions issuance on the applicable performance surety. The Village's building-permit program is administered to protect the health, safety, and general welfare of residents and to ensure registered, bonded contractors perform the work. Confirm your specific bond amount and permit conditions with Building Services at (815) 936-5100 before you apply.

You need this bond if you are

A contractor or utility crew excavating in a Bradley street, sidewalk, or right-of-way
A property owner or developer whose project requires a utility trench or service connection
Filing for an excavation permit with the Village's Building Services division
Renewing or replacing an excavation bond whose original permit period has expired

One application, issued instantly.

These are the actual underwriting fields, including a one-time consent to a soft credit pull. The pull never affects your score, and your price — from a $100 minimum — is set at application.

Start the application →
FAQ

Common questions.

How much is the Bradley excavation permit bond?Premiums cost 1% of the bond amount, with a $100 minimum. The amount itself is set by Building Services on your specific permit based on the scope of the excavation — there is no single villagewide figure. Enter the amount your permit shows and your exact price appears at the application.
What amount should I enter?The penal sum shown on your excavation permit, set by Building Services. If you have not yet been issued a permit, contact Building Services at (815) 936-5100 for the figure before you apply.
What does the bond guarantee?It guarantees you will properly backfill and restore the street, sidewalk, or right-of-way once the excavation is closed. If the Village has to complete the restoration or absorb damage, it can claim against the bond.
Do I pay the full bond amount?No. The bond amount is the Village's coverage limit if a claim is made against you, not your cost. You pay only the premium — 1% of the bond amount, $100 minimum.
Is there a credit check?The application includes a credit consent, but it authorizes a soft credit pull only — a soft inquiry that never affects your score. No hard inquiry ever runs on this bond.
Related bonds

Other Illinois bonds.

Get the excavation permit bonded, not delayed.

Premiums from $100, soft pull only. Enter the amount Building Services set and file the same day.

Your premiumfrom $100
Apply now →