The City of Bridgeport Water Pollution Control Authority (WPCA) requires a bond before a contractor connects to or works on the City’s sewer system. It guarantees the work is done to WPCA standards and the system is protected. We issue it at a flat 3% with no credit check — enter the amount the WPCA set and the premium updates.
















No underwriting queue for the standard WPCA bond — enter your amount, pay, and file with the City. Here is the whole thing:
Your business details, the bond amount the WPCA required, and the effective date — that is the entire application.
No credit check and no waiting — the executed bond is generated as soon as you pay. Larger amounts may get a quick review.
Submit the executed bond with your sewer / drain connection permit. Wet-ink originals mailed whenever the City insists.
Bond amount × 3% = your premium, one-time, $275 minimum. Enter the figure the WPCA required and the premium updates.
The City of Bridgeport Water Pollution Control Authority (WPCA) runs the City’s sewer and wastewater system. When a contractor connects a building to the sewer, or works on a drain or main tied to that system, the WPCA conditions the permit on a surety bond.
The bond is a workmanship-and-protection guarantee. It runs to the City / WPCA as obligee and stands behind your obligation to make the connection properly, restore the surface, and avoid damage to the sewer system. If your work harms the system or is left defective, the WPCA can recover its cost against the bond.
It is not insurance for you — if the surety pays the City, you repay the surety. We issue the amount the WPCA set, at a flat 3% with no credit check.
Submit the application with the bond amount the WPCA required — the executed bond is generated instantly, ready to file.
Start the application →If yours isn't here, the bond team can usually answer within the hour.
Five-minute application, flat 3%, $275 minimum. Enter the amount the WPCA set and file the same day.