The City of Bridgeport Water Pollution Control Authority (WPCA) requires a bond before a contractor connects to or works on the City’s sewer system. It guarantees the work is done to WPCA standards and the system is protected. Priced at 1% of the bond amount, $100 minimum — enter the amount the WPCA set and your exact price appears at the application. The application collects no credit information, and most applications approve instantly.
















No underwriting queue for the standard WPCA bond — enter your amount, pay, and file with the City. Here is the whole thing:
Your business details, the bond amount the WPCA required, and the effective date — that is the entire application.
No waiting for a quote — the executed bond is generated as soon as you pay, at the price shown for your bond amount. Larger amounts may get a quick review.
Submit the executed bond with your sewer / drain connection permit. Wet-ink originals mailed whenever the City insists.
The City of Bridgeport Water Pollution Control Authority (WPCA) runs the City’s sewer and wastewater system. When a contractor connects a building to the sewer, or works on a drain or main tied to that system, the WPCA conditions the permit on a surety bond.
The bond is a workmanship-and-protection guarantee. It runs to the City / WPCA as obligee and stands behind your obligation to make the connection properly, restore the surface, and avoid damage to the sewer system. If your work harms the system or is left defective, the WPCA can recover its cost against the bond.
It is not insurance for you — if the surety pays the City, you repay the surety. Pricing on the amount the WPCA set is 1% of the bond amount, with a $100 minimum; the application collects no credit information, and most approvals are instant.
Submit the application with the bond amount the WPCA required — the executed bond is generated instantly, ready to file.
Start the application →Pricing from $100. Enter the amount the WPCA set and file the same day.