Please see the attached documents for details.
ALL QUOTES MUST BE SUBMITTED AS A PDF.
The contractor must supply and install two replacement Vertiv UPS systems: one 10 kVA/kW 208V system and one 40 kVA/kW 480V system, including removal and recycling of two existing Liebert NX 3-Phase UPS cabinets and one bypass cabinet. The UPS systems must meet detailed technical specifications (e.g., N+1 redundancy, front-to-top airflow, UL 1778 listing, hot-swappable modules). The contractor must also provide documentation of similar installations, one half-day of customer training, on-site startup service, and a labor warranty of at least 12 months.
"US""39529""STENNIS SPACE CENTER""MS""USA""JERRY HLASS ROAD, BLDG. 1111""SATPC0043055 Tab 06 BNJ REV.pdf"503857"file"".pdf""1""2026-11-18T20:46:15.977+00:00""2fc7a939d6ad49a6b27d340870089b7f""public""0""public""88de525a3dd94a87a393caab15deeebd""0"3"0""SATPC0043055 Tab 10 RFQ Open Market.pdf"282602"file"".pdf""1""2026-11-18T20:46:15.977+00:00""1ead5e89f59c465c84399e6915a74322""public""0""public""daac4893f6654adda1a44e73e5a6cdc6""0"2"0""SATPC0043055 Tab 04 4 SOW.pdf"112207"file"".pdf""1""2026-11-18T20:46:15.977+00:00""3e1c4f3565b04054945aa8e7af380dc8""public""0""public""acebce042c2e4b8a835bfafef3fde8ff""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ff4b8e5b126540fba442336af5d7b1a1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.