Snow Removal Services Weather Forecast Office (WFO) Johnston
The contractor must provide all personnel, materials, tools and supervision for snow removal and ice treatment. Snow removal must be performed when two or more inches of snow falls, or upon request by the Meteorologist-in-Charge (MIC), and must not allow snow to accumulate over four inches. Snow removal includes the parking lot of the main facility (including entrance drive and all paved surfaces), the sidewalks to all entry ways of the building and to the instrument equipment and storage/generator building, and the driveway to the radar complex. Snow must be plowed to allow trash removal vehicle access. Ice treatment must be applied after snow removal and upon request by the MIC, using ice melting granules that will not kill grass and/or shrubs or damage concrete and asphalt surfaces, applied to designated sidewalks, around all exterior doors, and to the parking lot.
We post new exterior maintenance opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98115""SEATTLE""WA""USA""WESTERN ACQUISITION DIVISION""7600 SAND POINT WAY NE BLDG 1,""Sol_1305M327Q0042_Amd_0002.pdf"994731"file"".pdf""1""2026-11-19T21:27:51.768+00:00""6800a9beeeeb478dbe4700b2dbb41c21""public""0""public""c6fb7231d5774d66ac1fb600a82f825e""0"6"0""Sol_1305M327Q0042_Amd_0001.pdf"418576"file"".pdf""1""2026-11-17T18:16:37.653+00:00""cd32838fc90a45dba52243034f5e4c8f""public""0""public""60a32f683f134d9e88602a0b929b4ba9""0"5"0""Sol_1305M327Q0042.pdf"375818"file"".pdf""1""2026-11-13T20:43:31.027+00:00""0e23eb1c46294fe08cb95c04a749992a""public""0""public""dc275641f97e44428540a0dc53b591e3""0"4"0""Attachment_1_SOW_Snow_Removal_Services_WFO_Johnston_1305M327Q0042.pdf"90836"file"".pdf""1""2026-11-13T20:43:31.027+00:00""6e0ffc95c0dc49e9806a2f37b4d70ef6""public""0""public""a1546cd6494e4c01a8ee905e25eb8927""0"3"0""Attachment_2_Snow_Removal_Map_1305M327Q0042.pdf"574273"file"".pdf""1""2026-11-13T20:43:31.027+00:00""52cdf9ace9884499b03d7417eeeaefb4""public""0""public""20d32f6a5a724508b44bf664f1c50423""0"2"0""Attachment_3_Wage_Determination_2015-4979_Rev_30.pdf"4486517"file"".pdf""1""2026-11-13T20:43:31.027+00:00""7d11bc86200748238078fdf194a3eb11""public""0""public""502d7a905bb6477f8ea0484d598b92f4""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ff0edacd93474f8080049f1ed8ef0281), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.