Amendment 1. HAVO 326181 Rehabilitate Rainshed & Water Treatment System located at Hawaii Volcanoes National Park, Volcano, Hawaii
The work consists of rehabilitating the park's rainwater catchment system, including improvements to ground catchment, collection pipes, filtration, storage tanks and equipment, and replacing site pavement. It also includes replacing Building 43 with a new pre-engineered metal building, replacing Building 241 with a similar open-air structure incorporating steel columns, and Section 106 Mitigation measures including Historic Structure Report assessment on historic redwood tanks and minor repairs. Options include constructing a new one-story CMU building, additional improvements to Ground Catchment 1, replacing the perimeter security fence, and replacing additional pavement.
We post new appliances opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""80225""DENVER""CO""USA""12795 W ALAMEDA PKWY PO BOX 25287""Sol_140P2026R0091_Amd_0001.pdf"189988"file"".pdf""1""2026-09-28T16:05:20.214+00:00""5ac934b49bfe413cba5cdb8abd7a4934""public""0""public""655bf7f6c64d4ee38bc68454ca95466b""0"17"0""B09_Att_(15)_HAVO_326181_-_Site_Walk_Requirements_30JUL2026_0001.pdf"97332"file"".pdf""1""2026-09-28T16:05:20.214+00:00""01a14bdbe1f34261a01dbc84a0db76be""public""0""public""c42dd4a7e11c49ddb506e3422993f86c""0"16"0""Sol_140P2026R0091.pdf"660225"file"".pdf""1""2026-09-18T21:13:58.266+00:00""470f636e63bc4e4ba8b25c4aa0b94589""public""0""public""3f687331a42c4260b2336124483fbc0a""0"15"0""B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf"32074277"file"".pdf""1""2026-09-18T21:13:58.266+00:00""01e74ec9bd3f4d8998513bd875e7d657""public""0""public""ce68fa34b88c4b48b1229ebe35841999""0"14"0""B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf"40961854"file"".pdf""1""2026-09-18T21:13:58.266+00:00""93d7ddd8923a472e91aeb1bfa3f93181""public""0""public""d93399b3f6064b5b9a967578e898bc6e""0"13"0""B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf"2378996"file"".pdf""1""2026-09-18T21:13:58.266+00:00""74172675c3834edea02057a8156dda65""public""0""public""65f45e6fdd1f4d15b4e6736e0697c5f4""0"12"0""B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf"330355"file"".pdf""1""2026-09-18T21:13:58.266+00:00""f48c81c6f86b4a5c96955116eb8ab58d""public""0""public""30e41d4cfeb043468c5f2d00806f7515""0"11"0""B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf"14847342"file"".pdf""1""2026-09-18T21:13:58.266+00:00""5f2d868bc22a487dad0afc323302e23c""public""0""public""c274f12d7693495fa472e39822706faf""0"10"0""B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf"146344"file"".pdf""1""2026-09-18T21:13:58.266+00:00""6727fed303f54797a0525d824e785254""public""0""public""b78fb451002f45a79b8a9db4fc3e08b9""0"9"0""B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx"215090"file"".xlsx""1""2026-09-18T21:13:58.266+00:00""b398df41c9ea4029ab7819cec04e0468""public""0""public""87087984b803446bbcc8b47f79d0815a""0"8"0""B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdf"135777"file"".pdf""1""2026-09-18T21:13:58.266+00:00""7e5097ab55884a3591a1361957fc30f1""public""0""public""6b04cf9773754134b560f6d266631124""0"7"0""B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf"2209108"file"".pdf""1""2026-09-18T21:13:58.266+00:00""513d08d3e9fd4fbb88ee68fe605dc1e5""public""0""public""60511e542e9946e7b487976883512703""0"6"0""B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf"1035752"file"".pdf""1""2026-09-18T21:13:58.266+00:00""c6fc3cbf5d004f2c998735eda61de510""public""0""public""4483df87cc1240e6b708e105b2df638d""0"5"0""B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx"350562"file"".docx""1""2026-09-18T21:13:58.266+00:00""e19c95950d9b453f8a02f6d9612adc19""public""0""public""e7455f315d47419c820c2e4d0cdc8ffe""0"4"0""B08_Att_(12)_GenRefs.docx"28413"file"".docx""1""2026-09-18T21:13:58.266+00:00""567f56001a0c433d8a3144cbcf303478""public""0""public""5d49314335914cd4b666231069db201a""0"3"0""B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf"16793820"file"".pdf""1""2026-09-18T21:13:58.266+00:00""99ee6434b6724e789591edfa4448995d""public""0""public""660c9fbe37e1497c9d93a74f225ade83""0"2"0""B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf"3824201"file"".pdf""1""2026-09-18T21:13:58.266+00:00""8eadcaaac6ac4d4c8875ad382ef0d64d""public""0""public""671e6ab97dac4111beb969c275af67f3""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice fa90c8a806d542b98e23d10758078898), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.