Lyons RD N of L30 Canal to Boynton Bch Blvd
Engineer's Estimate $15,800,000
The project involves roadway construction on Lyons Road from L.W.D.D. L-30 Canal to Boynton Beach Boulevard. The work includes milling and resurfacing of existing asphalt pavement, roadway widening, drainage improvements including new inlets, pipes, and box culvert extensions, lighting analysis and installation, signalization, signing and pavement markings, and installation of fiber optic cable and conduits. The project also includes clearing and grubbing, regular excavation, embankment, optional base, concrete curb and gutter, concrete sidewalk, sodding, and riprap. The project length is approximately 3.189 miles.
We post new plumbing opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Engineering and Public Works (solicitation IFB-360-2018503_2020110REBID-7), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.