We'll email you new equipment maintenance & rental opportunities in Idaho as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1284LL27Q0007 is issued as a Request for Quotation (RFQ) for Ammonia System Maintenance. The vendor shall provide the personnel, supplies and equipment needed to perform the maintenance to industry standards and specifications.
See attachment 1284LL27Q0007 for more details.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 811310 The small business size standard is $12.5 million dollars. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The contractor shall provide personnel, supplies, and equipment to perform maintenance on an ammonia refrigerant system at the Coeur d'Alene Nursery. The system includes compressors (2), condensers (1), evaporators (20), vessels (3), heat exchangers (2), glycol pumps (3), glycol tanks (1), remote sump tank (1), defrost transfer tank (1), piping, ammonia detection testing/calibration (2), computer controlled safeties, high level testing, E-stop testing, and ventilation testing. Preventative maintenance includes inspections per IIAR-6 and manufacturer recommendations, quarterly, semi-annual, and annual maintenance, maintaining oil, refrigerant, and grease logs, valve lubrication and exercising, and an annual IIAR-6 Inspection and Findings and Deficiencies Report. Detailed service reports, checklists, and logbooks are required. The contractor shall conduct all work during regular business hours (M-F, 0700-1600 PT), excluding holidays, and complete all maintenance between 03/02/2027 and 03/01/2028 for the base year.
"US""US""844012310""Ogden""UT""USA""324 25th ST""1284LL27Q0007.pdf"783764"file"".pdf""1""2026-11-19T22:01:56.097+00:00""7f40423374d147feb2b5c530d5065db1""public""0""public""deb94079b90e4da5b127b99f88f445b5""0"3"0""Key Personnel Form.pdf"114948"file"".pdf""1""2026-11-19T22:01:56.097+00:00""749547fa69064c38b7372b60814be5ae""public""0""public""fd666b89af8e48bea00bce587e672f23""0"2"0"Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice fa85c2ebe38e488db8ef63dfe2d3b453), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.