Vault pumping services at designated recreation sites within the Kemmerer Field Office. The contractor shall provide all labor, supervision, equipment, materials, water, transportation, and disposal services necessary to pump, clean, disinfect, and properly dispose of liquid and solid waste from vault toilets and associated facilities. Services will be performed at remote locations and require specialized equipment, including a minimum 1,000-gallon septic tank truck or equivalent, vacuum pump, and appropriate hoses and cleaning equipment. Services are anticipated to be required at least once annually during the May 15 through October 30 operating season, with additional service as needed, and shall be completed within 72 hours of Government notification. The anticipated contract period is one base year with four option years.
Period of Performance:
Base Year: 12/14/2026 - 12/13/2027
Option Year 1: 12/14/2027 - 12/13/2028
Option Year 2: 12/14/2028 - 12/13/2029
Option Year 3: 12/14/2029 - 12/13/2030
Option Year 4: 12/14/2030 - 12/13/2031
Basic Contracting Requirements:
Instructions to Offerors:
Primary POC: Contracting Officer Crystal Martinez - crystal_martinez@ios.doi.gov - 307-775-6336
The contractor shall provide all labor, supervision, equipment, materials, water, transportation and disposal services to pump, clean, disinfect and properly dispose of liquid and solid waste from vault toilets and associated facilities at remote recreation sites including Names Hill, Fontenelle, River Access, Tail Race, Weeping Rock, Spillway Boat Ramp, Slate Creek and Pine Creek, using a minimum 1,000-gallon truck, vacuum pump and hoses, performing washdown, leaving fresh water, cleaning debris and adding disinfectant, with service at least annually during May 15 through October 30 within 72 hours of notification.
We post new waste & recycling collection opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140LL027Q0021.pdf"418008"file"".pdf""1""2026-11-14T23:19:06.634+00:00""d6ffee19fbcc49b0add6cb0dc5a2b598""public""0""public""0d9c59f20e1d4f139620a3967d87bba5""0"5"0""Attachment_3-_Quote_Schedule.pdf"217448"file"".pdf""1""2026-11-14T23:19:06.634+00:00""18293c13450941129a5500800a92a280""public""0""public""6cd4893793144817b9fc3c162309ac1a""0"4"0""Attachment_4_-_Wage_Determination_2015-5409_Rev_30_posted_8-22-26.pdf"66062"file"".pdf""1""2026-11-14T23:19:06.634+00:00""bfc7135c6f784779a9dc0c451e81e93b""public""0""public""8dca609b47da4d78bfde0a966b2380f5""0"3"0""Attachment_2_-_Maps.pdf"3321605"file"".pdf""1""2026-11-14T23:19:06.634+00:00""beb462d6a19f421eaee3d78986c4fa04""public""0""public""adbfd06ba76c4995b063837241f382c9""0"2"0""Attachment_1-_Statement_of_Work.pdf"295578"file"".pdf""1""2026-11-14T23:19:06.634+00:00""a812a23cc7574f51b4d4648a500a2973""public""0""public""809c43563cad4d93bbc61e1ee27b56b5""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f885f749aa4542e3a8184ab50373d3d3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.