Amendment 0007 has been posted. Amendment 0007 extends the date for receipt of offers. The new date for receipt of offers is 10/14 at 3PM EDT. Amendment 0007 also provides an update to RFIS and a new basis of design for HVAC units.
Amendment 0006 has been posted. Amendment 0006 extends the date for receipt of offers. The new date for receipt of offers is 10/9 at 3PM EDT. Amendment 0006 also excludes the draft schedule from the page limit for Technical Volume I and provides responses to technical questions.
Amendment 0005 has been posted. Amendment 0005 extends the date for receipt of offers. The new date for receipt of offers is 10/2 at 3PM EDT.
Amendment 0004 has been posted. Amendment 0004 extends the date for receipt of offers. The new date for receipt of offers is 9/18 at 3PM EDT.
Amendment 0003 has been posted. Amendment 0003 provides the site visit sign-in sheet and agenda from the 8/20 site visit.
Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map.
Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments.
The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
Work includes selective demolition, general construction and alterations, electrical panel and power upgrades, UPS, building management system interfaces, HVAC, renovation of existing space into telecom rooms, data center cabling and rack work, Cat 6A communications cabling, fiber backbone upgrades campus wide, diversified WAN path, physical security upgrades, duct bank construction and hazardous material abatement across numerous campus buildings and nearby CBOCs.
We post new general contractors opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""Amendment 0007.pdf"88119"file"".pdf""1""2026-10-07T20:06:45.819+00:00""06660da10c1e49038ecd28909c9c9dfd""public""0""public""9d8377e98b804627be16105d0f832503""0"55"0""RFI Update 10-7-26.pdf"117809"file"".pdf""1""2026-10-07T20:06:45.819+00:00""290d17f9a27740839bd0f5b57c5f8218""public""0""public""053adc131d42402fa26a45630cfe20f2""0"54"0""ME_SUBMITTAL_PKA-AK36NL_PUZ-AK36NL_6PSmo.pdf"4296484"file"".pdf""1""2026-10-07T20:06:45.819+00:00""13daaa3ae8484d58b192632afc7ef603""public""0""public""9539b45c2c6e4bb091d02c0f339a0504""0"53"0""ME_SUBMITTAL_PKA-AK24NL_PUZ-AH24NL_XbtyE.pdf"4006348"file"".pdf""1""2026-10-07T20:06:45.819+00:00""a99ff42286ad4d1fa3e5cf88b6ad2a95""public""0""public""43dd8844cec54ea98a0c6d71f510cdc5""0"50"0""Amendment 0006.pdf"88110"file"".pdf""1""2026-09-24T20:42:28.932+00:00""b97695c2654e4a7e9aa0bb45f2872750""public""0""public""9b4cee07b4d84564a1ceffcefb34a65a""0"46"0""RFI Responses.pdf"458639"file"".pdf""1""2026-09-24T20:42:28.932+00:00""705f0f0cc31443019bd51403784bde0c""public""0""public""dc006ad63cb2465ea4da15021e4f2aa1""0"45"0""Amendment 0005.pdf"87198"file"".pdf""1""2026-09-14T13:58:53.321+00:00""202043cf97db492a881edab76c61e350""public""0""public""a922d1978f5449b78a2d1578e0db3e36""0"42"0""Amendment 0004.pdf"87219"file"".pdf""1""2026-08-31T19:39:56.408+00:00""2e3a716ee58948b48bab68a74f47d6c6""public""0""public""198d76ebb57b4cf4b5812c74b50e3c7e""0"41"0""Site Visit Sign In Sheet 8-20-26.pdf"1922974"file"".pdf""1""2026-08-25T14:08:17.672+00:00""c86abeaea47f452aabe549c78a9c2fdb""public""0""public""b4c28bf8de134527888f1e7538eb7ebf""0"40"0""Site Visit Agenda.pdf"131024"file"".pdf""1""2026-08-25T14:08:17.672+00:00""665d1fb22bfe4d5eb1c3ed886d2d9b98""public""0""public""c770bbcf308743a1bbe98971d8253379""0"39"0""Amendment 0003.pdf"84832"file"".pdf""1""2026-08-25T14:08:17.672+00:00""403e3e57e5fc416d9ee79e842b317d55""public""0""public""aedc047ae2ff4d5eacb966b4ed60d50a""0"38"0""Amendment 0002.pdf"85486"file"".pdf""1""2026-08-19T18:38:15.816+00:00""e9cce8e404e74a89925277fc1cb4f235""public""0""public""2f6aed1512b345f893144e5720bd1ef5""0"36"0""Amendment 0001.pdf"86702"file"".pdf""1""2026-08-13T16:35:53.458+00:00""1a396f566d3f4a149a63c4bca8c863d1""public""0""public""cea15f6b81e44a6aad934f5fc4c01bad""0"33"0""Attachment 11 - Site Visit Details.docx"82151"file"".docx""1""2026-08-19T19:15:59.058+00:00""bac9a4f1005b4c2a9fb0f4a50fa94307""public""0""public""586c9787a7654b01a4ad7ed06b30dda3""0"31"0""Attachment 10 - Wage Determination.pdf"38399"file"".pdf""1""2026-08-12T19:50:37.969+00:00""eee849a5fed841f5bc75a60b95b18b3b""public""0""public""800ef37bcbb948e78ea230f47b691cd6""0"30"0""Attachment 9 - Division Pricing Template.xlsx"10086"file"".xlsx""1""2026-08-12T19:50:37.969+00:00""939f1789f0dd4ecd9ff2dcefecc15b3b""public""0""public""953d8043ff5b4d5ab889dad8192534ab""0"29"0""Attachment 8 - Key Personnel.docx"103547"file"".docx""1""2026-08-12T19:50:37.969+00:00""30105bd64b2547f2af7f521aa0c166b6""public""0""public""b857c9f916c84eb7a2f4ef931adb4d86""0"28"0""Attachment 7 - Key Subcontractor Information.docx"99985"file"".docx""1""2026-08-12T19:50:37.969+00:00""23cb541807304dd8a7ad290939590d79""public""0""public""d6994192cd8449f1b0115f759e1a681b""0"27"0""Attachment 6 - Limitations on Subcontracting - Construction.docx"28195"file"".docx""1""2026-08-12T19:50:37.969+00:00""e6bfcdb3d3774a5a8907d918c698deaa""public""0""public""a7b595100e2d4092a0b139e60ec977b2""0"26"0""Attachment 5 - Vol 4 Drawings.pdf"15249619"file"".pdf""1""2026-08-12T19:50:37.969+00:00""7fcb7f780f3b4262b761bd41254513dd""public""0""public""f3ee439d8c014bcdbf7a4548b0a88fb3""0"25"0""Attachment 4 - Vol 3 Drawings.pdf"13054349"file"".pdf""1""2026-08-12T19:50:37.969+00:00""19578ea8fbbf45b9a819ded19e8e6d6f""public""0""public""13b2b21e8c7b4fba964dc20270844a5e""0"24"0""Attachment 3 - Volume 2 Drawings.pdf"43369154"file"".pdf""1""2026-08-12T19:50:37.969+00:00""8a82b233bceb458abde0f934b7843c0a""public""0""public""6a4d7c6776a94fd3aa8959cbc72080b5""0"4"0""Attachment 2 - Vol 1 Drawings.pdf"15572873"file"".pdf""1""2026-08-03T20:05:33.779+00:00""352230b6cee842eb949238984fa0762f""public""0""public""0f1215fdde9844be9855117a6fe2c0fb""0"3"0""Attachment 1 - Specifications.pdf"24215448"file"".pdf""1""2026-08-03T20:05:33.779+00:00""a49dde98fab941b19b5943a1988225f2""public""0""public""4cccb5f105ce4073a7a3308e981c7550""0"2"0""36C77626R0104.pdf"624949"file"".pdf""1""2026-08-03T20:05:33.779+00:00""61eed2d2672f4fbdb515d20fd06d14d7""public""0""public""88062b095bbb4fecbedf34cef9b436ea""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.