UT-Battelle, LLC. (the Company), is the Management and Operations Contractor for the Oak Ridge National Laboratory (ORNL), located in Oak Ridge, Tennessee. The Company seeks proposals for the Fiber Optic Phase Modulator, or their domestic equivalents, to support a department of Energy (DOE) funded project.
Request for Quotation - RFQ - PR520556, Fiber Optic Phase Modulator
Attachment A - Terms and Conditions - Purchase Order Commercial Products and Services, dated 09.30.2026
Attachment B - Prime Flowdown Clauses, dated 09.30.2026
Attachment C - Bill of Materials - PR520556
Attachment D - Reps and Certs - Abbreviated - 03.09.2026
FAR 52.211-6, Brand Name or Equal applies.
ORNL is requesting a quote for the same or domestic equivalent of a Phase Modulator, PM705, with standard FC/PC connectors. Central wavelength: 705 nm, for operation at 730 nm too. Half wave voltage (@ 1 kHz): < 4 V. Insertion loss: < 6 dB. Minimum optical rise time (10/90): app. 200 ps. Maximum optical input power: 20 mW cw. Fibers: 1 m PM-fiber at input and output. Fiber connectors: FC/APC, small key without connector, FC/PC or wide key on request. Polarization (Fiber): > 18 dB. Polarization (Chip): > 30 dB. Electrical connection: SMA(f), input impedance 50 Ohms.
We post new telecommunications opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""37831""Oak Ridge""TN""USA""Oak Ridge National Laboratory""PO Box 2008""Attachment A - Terms and Conditions - Purchase Order Commercial Products and Services - BSD-CS-2154 (09.30.2026).pdf"262925"file"".pdf""1""2026-11-17T22:09:10.093+00:00""559497aed7974b3ea368c03c8c62ad7a""public""0""public""d5d59ead0a5047e6aa9aa620bc75ce02""0"5"0""Attachment B - Prime Flowdown Clauses - BSD-CS-2258 (09.30.2026).pdf"418419"file"".pdf""1""2026-11-17T22:09:10.093+00:00""44cdcc46c1c64751a0737067efd7a4a9""public""0""public""43688dfc490748a8aaea8b905c250353""0"4"0""Attachment C - Bill of Materials - PR520556.pdf"50131"file"".pdf""1""2026-11-17T22:09:10.093+00:00""9a5a4b1c661b432089322e3125c88c55""public""0""public""bbef49153e5d436d950755f7e571a9fe""0"3"0""Attachment D - Reps and Certs - Abbreviated - BSD-CS-2260 (03.09.2026) - PR520556.pdf"987929"file"".pdf""1""2026-11-17T22:09:10.093+00:00""6bcbb996fd61421a8becaeb54e05ed2c""public""0""public""549e6463aab440588e46e8bff7c2e9b8""0"2"0""RFQ - PR520556.pdf"134362"file"".pdf""1""2026-11-17T22:09:10.093+00:00""569fa9d574fa4471bfc03371619d79bd""public""0""public""f35426cef7ad4ec18a4679636d2549a9""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f60a12c8f0994282a6344941903227f6), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.