**Amendment A03: **
The purpose of this solicitation amendment is to extend the offers due date.
It is taking longer than expected to respond to the questions received. The offers due date is extended to 10/22/2026.
All other terms and conditions remain unchanged.
**Amendment A02: **
The purpose of this solicitation amendment is to extend the offers due date.
It is taking longer than expected to respond to the questions received. The offers due date is extended to 10/08/2026.
All other terms and conditions remain unchanged.
**Amendment A01: **
a. Post questions and answers (Q&As),
b. Post the site visit sign-in sheet,
c. Post the Geotech Report,
d. Update a clause,
e. Extend the offers due date.
Attached are the questions received to this date with some answers. The Government is researching the rest of the questions and will post those answers soon.
Attached is the site visit sign-in sheet.
Attached is the Geotech Report.
HHSAR clause 352.223-70 Safety and Health is updated to the OCT 2026 version and the full text is provided at the end of this amendment.
The offers due date is extended to 09/24/2026.
Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.
All other terms and conditions remain unchanged.
Request for Proposals 75H70126R00026
iHouse Apartment Construction
Goal: The objective of this project is to adapt and construct a 19-unit apartment building to a new location while ensuring compliance with all applicable local building codes and regulations.
Set-Aside: ISBEE set-aside.
Product Service Code: Y1FA Construction Of Family Housing Facilities
NAICS Code: 236220, Commercial and Institutional Building Construction with a size standard of $45M
Location: Indian Rte 6290, Tonalea, AZ 86044 County: Coconino
POP: 365 calendar days
Construction Magnitude: Between $5,000,000 and $10,000,000
Contract Type: firm-fixed-priced
TERO: TERO not is applicable.
The contractor shall furnish all labor, equipment, materials, supplies, supervision, and transportation necessary for the iHouse Apartment Construction. The work includes, but is not limited to, concrete forming and accessories, cast-in-place concrete, concrete unit masonry, metal fabrications, rough carpentry, sheathing, thermal insulation, standing seam metal roofing, pre-hung wood and fiberglass doors, vinyl windows, door hardware, one-coat stucco, gypsum board, tiling, resilient plank flooring, painting, toilet accessories, fire protection specialties, residential appliances, manufactured casework, solid surfacing countertops, wet-pipe sprinkler systems, domestic water piping, waste and vent piping, electric domestic water heaters, residential plumbing fixtures, metal ducts, air duct accessories, interior and exterior lighting, communications horizontal cabling, digital addressable fire-alarm systems, site clearing, grading, excavation and fill, paving and aggregate base, and concrete work for utilities. The contractor is also responsible for all coordination, submittals, project management, and closeout procedures as detailed in the project manual.
We post new general contractors opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20852""Rockville""MD""US""The Reyes Building 801Thompson Avenue, Suite 400""98121""SEATTLE""WA""USA""2201 6TH AVENUE""MAIL STOP RX-24""A03 SF-30 Ext Offers Due iHouse Apartment Construction.pdf"125497"file"".pdf""1""2026-10-01T17:17:12.853+00:00""863dbdae3bd6426b9fc92ba562b16c41""public""0""public""ddfe7506deb44db8a1d8dd2f41774fab""0"16"0""A02 SF-30 Ext Offers Due iHouse Apartment Construction.pdf"103481"file"".pdf""1""2026-09-17T20:45:43.089+00:00""40ea5d006a9b4c9385ba4c1b5d194b69""public""0""public""57f9da47a4cd46b29f40b5ff88815f62""0"15"0""A01 GeoTech Report iHouse.pdf"5035898"file"".pdf""1""2026-08-19T16:21:56.337+00:00""f190b5643a844609ac6a4e74291b7161""public""0""public""33789d29e12e411b9b761d93cbadb826""0"14"0""A01 Sign-In Sheet Site Visit iHouse.pdf"863769"file"".pdf""1""2026-08-19T16:21:56.337+00:00""bb873379fba14eb18a3f6063f8b7de52""public""0""public""da90cf281806436c9bb0d7677f30627c""0"13"0""A01 SF-30 QA iHouse Apartment Construction.pdf"288330"file"".pdf""1""2026-08-19T16:21:56.337+00:00""3a6a0a12940e4454a3a8a5f4fb78fa96""public""0""public""c6473582a48747d0bcb29350b7b5eec4""0"12"0""A01 QA iHouse Apartment Construction 18Aug2026.pdf"250472"file"".pdf""1""2026-08-19T16:21:56.337+00:00""130caa38c48e45718031bee62a9cb880""public""0""public""b07e451c0193489ea679309046e15f1c""0"11"0""J03 iHouse Apt 02 Phase 4 Drawings.pdf"43426306"file"".pdf""1""2026-07-15T16:10:23.418+00:00""92341950b2c246a9aa3c5e3ffb0a6785""public""0""public""be749ecad0904a53a033ea80426616b2""0"10"0""J02 iHouse Apt 01 Phase 4 BOD.pdf"15209871"file"".pdf""1""2026-07-15T16:10:23.418+00:00""31bfff016da74c95bcaacfaf5a0a7f96""public""0""public""9edd163f815440dd87fe8bbd052a4254""0"9"0""J04 iHouse Apt 03 Phase 4 Specifications.pdf"10714648"file"".pdf""1""2026-07-15T16:10:23.418+00:00""2f1a4abe8a8542d8930cc140c9214a3c""public""0""public""e0b80381fb414581861406463d49eca2""0"8"0""J01 SOW iHouse.pdf"550820"file"".pdf""1""2026-07-15T16:10:23.418+00:00""f40bce1d6c634b66b83bd91a60adfdc3""public""0""public""57bc7b2030ac44b89ae352285408b0a1""0"7"0""J09 WH 347 Payroll Exp.pdf"187233"file"".pdf""1""2026-07-15T16:10:23.418+00:00""2e905662044f4a2aa27a5cbd7e11da0d""public""0""public""8402e034168246c8b403cceb642690f7""0"6"0""J07 IHS IEE Representation Form iHouse.pdf"138458"file"".pdf""1""2026-07-15T16:10:23.418+00:00""8e48ab8970af480eb7dafd7af3da9826""public""0""public""4f3fb52a1e604a13a066e36955a3790f""0"5"0""B01 RFP 75H70126R00026 iHouse.pdf"639401"file"".pdf""1""2026-07-15T16:10:23.418+00:00""ba98f2cf67194c3cb8bc12bbd2d7647c""public""0""public""df1ba40c12f143bb8cb68321f13708c1""0"4"0""J05 Wage Det AZ20260043 18May2026.pdf"60769"file"".pdf""1""2026-07-15T16:10:23.418+00:00""db4065d9e235484fa61b7399ff8be561""public""0""public""2d76822d0cc0483dab95269c5124b915""0"3"0""J08 Release of Claims iHouse.docx"14326"file"".docx""1""2026-07-15T16:10:23.418+00:00""61430fed866f4b86bddcdb91141c3a33""public""0""public""49a7eb5b06fb405cb77333c207fb8923""0"3"0""J99 Optional Form PPQ.docx"30352"file"".docx""1""2026-07-15T16:10:23.418+00:00""6a74ce1f734142b08f872dad4a6c3fd3""public""0""public""bbc375ada7d24a0f9f50972275f169b3""0"2"0""J06 Self Performed Calculation Sheet iHouse.docx"28459"file"".docx""1""2026-07-15T16:10:23.418+00:00""0afdc9b3128740b3b94398675f2145e8""public""0""public""853418058666400c8a0176b2779eae76""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f53032604b7b4725bc3530cf0161c2b8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.