HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Forest: Humboldt-Toiyabe National Forest (HTNF)
Bridgeport Ranger Station
The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.
Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.
ATTACHMENTS:
C04a ScheduleOfItems_SectionB_1240LT27Q0026
C04b DesignDrawings_1240LT27Q0026
C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026
C04d Experience Questionnaire_1240LT27Q0026
C04e Past Performance Data Sheet_1240LT27Q0026
** AWARD SCHEDULE:**
Site Visit: 11/03/2026 - to be held on Zoom do to location
Q&A Due Date: 11/04/2026
Quotes Due Date: 11/28/2026 - 1700 MT
Anticipated Award Date: 12/10/2026
POP: July/01/2027 - 10/29/2027 = 120 days
Contracting Officer Representative:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
The project requires the full removal and disposal of the existing steel and timber bridge, which consists of (4) 33-foot long, 24-inch deep H9 open-web steel joists, steel framing and railing posts, and timber decking and railing. The new bridge shall be a 6-foot by 35-foot glulam deck panel bridge with timber railing. Existing approaches will be reconstructed to match plans and the new grade of the bridge, and approach railing shall be installed. New timber sills will sit directly on bedrock and a concrete levelling course. The east approach will require bedrock removal for proper elevation and a suitable seat for the sill. The contractor shall submit a bridge removal/erection plan that clearly specifies the number of flights and flight days, and shall minimize the number of flights as much as practical. The work is located in the Hoover Wilderness at coordinates 38.2263°, -119.5767°, accessed via trail. Helicopter transports, mechanized saws and drills, and generators will be allowed for this project only under a special exception.
"US""US""81601""GLENWOOD SPRINGS""CO""USA""WHITE RIVER NATIONAL FOREST""900 GRAND AVENUE""C04 1240LT27Q0026_SOW.pdf"1397310"file"".pdf""1""2026-10-29T19:29:50.27+00:00""d6f8c28e6ea3432a807a8f6c625dcdb5""public""0""public""425fddccb8ae4944b70088d3f0e01671""0"15"0""C04a SOI_1240LT27Q0026.xls"29696"file"".xls""1""2026-10-29T19:29:50.27+00:00""e1be47ad4f124f09a7ed833b4a2ee926""public""0""public""3a8af96efded4653939e4d8e96a1833d""0"14"0""C04b Drawings_PCT TRAIL BRIDGE_1240LT27Q0026.pdf"9868982"file"".pdf""1""2026-10-29T19:29:50.27+00:00""cf98c0d4166a439da9792cbf77c93b62""public""0""public""2a7ef1fcadfa4763992672bedefdb8d2""0"12"0""C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026.txt"100561"file"".txt""1""2026-10-29T19:29:50.27+00:00""6efa76a89d26404788cfcb73b3effab5""public""0""public""aeb5016cbcbf4dfeaaa35f6418251695""0"8"0""C04d Experience Questionnaire _1240LT27Q0026.pdf"120019"file"".pdf""1""2026-10-29T19:29:50.27+00:00""e4a049eae3cb448ba81fb7c6d77fb0f7""public""0""public""9c98f673d00f4a0580d96f6ed3f909bd""0"7"0""C04e - Past Performance Data Sheet_1240LT27Q0026.pdf"77537"file"".pdf""1""2026-10-29T19:29:50.27+00:00""d2123139e3814a92a7c3f3e710123e4b""public""0""public""84dc9255baf5404ebffce31c05151549""0"4"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f4fababddec242cf9e116ccfb1aba466), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.