HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Rev2 (11/20/26)
Due Date Changed to 12/11/2026
C04d & CO4e has been Replaced with D04f and removed from SAM
Link to Video showing area is added as https://usfs-public.box.com/s/1nrudtpidlbvjnrs37ffzf0mefimog21
C04a updated SOI with CO4a Rev2
**Note Small Business Set Aside is “Total Small Business set-aside.” **
Magnitued Range are Between $500,000 and $1,000,000
Bid Bond amount: Shall be 20% of Quote
Quotes Must be submitted Electronicly to CO at lonnie.root@usda.gov
Revised Attachments:
C04 R2_1240LT27Q0026_SOW
C04a R2 SOI
C04b R2_Drawings_PCT TRAIL BRIDGE
CO4f_EvaluationFactors
C04g R2_QA 11_05_2026_PCT_Bridge
Removed Attachments:
C04d Experience Questionnaire_1240LT27Q0026 - Removed
C04e Past Performance Data Sheet_1240LT27Q0026 - Removed
============================================================
Rev1
Q&A Due Date: 11/11/2026
Vendor Questions must be Emailed Directly to the COR:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
VIRTUAL PRE-BID MEETING
The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible.
Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below.
https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su
Phone Number: (202) 650-0123
Meeting ID: 898702315#
====================================================================
HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Forest: Humboldt-Toiyabe National Forest (HTNF)
Bridgeport Ranger Station
The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.
Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.
ATTACHMENTS:
C04a ScheduleOfItems_SectionB_1240LT27Q0026
C04b DesignDrawings_1240LT27Q0026
C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026
C04d Experience Questionnaire_1240LT27Q0026 - Removed
C04e Past Performance Data Sheet_1240LT27Q0026 - Removed
** AWARD SCHEDULE:**
Site Visit: Friday, November 6 at 10:00am PST on Zoom
Q&A Due Date: 11/11/2026
Quotes Due Date: 11/28/2026 - 1700 MT
Anticipated Award Date: 12/10/2026
POP: July/01/2027 - 10/29/2027 = 120 days
Contracting Officer Representative:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
The contractor shall remove and dispose of the existing steel and timber bridge (consisting of four 33-foot long, 24-inch deep H9 open-web steel joists, steel framing and railing posts, and timber decking and railing) and install a new 6-foot by 35-foot glulam deck panel bridge with timber railing. Work includes structure excavation and backfill, construction of a temporary bypass trail and ford crossing, falling of hazard trees, installation of approach railing, and reconstruction of approaches. The contractor must submit a bridge removal/erection plan, safety plan, traffic control plan, and shop drawings. Helicopter transports, mechanized saws and drills, and generators are allowed. The contractor shall follow Leave No Trace principles and store food in bear-resistant containers.
We post new decks and porches opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""81601""GLENWOOD SPRINGS""CO""USA""WHITE RIVER NATIONAL FOREST""900 GRAND AVENUE""C04b R2_Drawings_PCT TRAIL BRIDGEup.pdf"12663900"file"".pdf""1""2026-11-20T21:00:59.517+00:00""cd42f28651e545e7b61b7a98a65618cb""public""0""public""0f8db9d25b1c41d49c3229312873c82f""0"20"0""C04 R2_1240LT27Q0026_SOW.pdf"1407003"file"".pdf""1""2026-11-20T21:00:59.517+00:00""63870f7db11645bd81c14b595a82fa00""public""0""public""39f1f367b9a84b91a9a505ba23a5ee7b""0"19"0""CO4f R2_EvaluationFactors.docx"19752"file"".docx""1""2026-11-20T21:00:59.517+00:00""3decf981d3144176a8aec661770ce5cf""public""0""public""3e1c94e2126544359faec7e867d7e9e5""0"18"0""C04a R2 SOI.xls"36864"file"".xls""1""2026-11-20T21:00:59.517+00:00""6755425cdefe4aad9232ad45cda304b3""public""0""public""04ea75469266420ca8e3c30801da1be5""0"17"0""C04g R2_QA 11_05_2026_PCT_Bridge.doc"51712"file"".doc""1""2026-11-20T21:00:59.517+00:00""de3858bbc1c94f48b8b9038859cf8a6d""public""0""public""9431fb42ff4944a0adad995ca79979fc""0"16"0""C04 1240LT27Q0026_SOW.pdf"1397310"file"".pdf""1""2026-10-29T19:29:50.27+00:00""d6f8c28e6ea3432a807a8f6c625dcdb5""public""2026-11-20T21:00:59.517+00:00""1""public""3927fcac83af497f8aa3c9fa1b3f8ca3""0"15"0""2026-11-20T21:00:59.517+00:00""C04a SOI_1240LT27Q0026.xls"29696"file"".xls""1""2026-10-29T19:29:50.27+00:00""e1be47ad4f124f09a7ed833b4a2ee926""public""2026-11-20T21:00:59.517+00:00""1""public""5db600f5b60e4ad79db238498f660b42""0"14"0""2026-11-20T21:00:59.517+00:00""C04b Drawings_PCT TRAIL BRIDGE_1240LT27Q0026.pdf"9868982"file"".pdf""1""2026-10-29T19:29:50.27+00:00""cf98c0d4166a439da9792cbf77c93b62""public""2026-11-20T21:00:59.517+00:00""1""public""80b70056f75e4e1f970eccb478160387""0"12"0""2026-11-20T21:00:59.517+00:00""C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026.txt"100561"file"".txt""1""2026-10-29T19:29:50.27+00:00""6efa76a89d26404788cfcb73b3effab5""public""0""public""79e953ef17a24efab1d52f2f5e569a2f""0"8"0""C04d Experience Questionnaire _1240LT27Q0026.pdf"120019"file"".pdf""1""2026-10-29T19:29:50.27+00:00""e4a049eae3cb448ba81fb7c6d77fb0f7""public""2026-11-20T21:00:59.517+00:00""1""public""8d213fbfe7ec49419dd6c904b1eaf2ba""0"7"0""2026-11-20T21:00:59.517+00:00""C04e - Past Performance Data Sheet_1240LT27Q0026.pdf"77537"file"".pdf""1""2026-10-29T19:29:50.27+00:00""d2123139e3814a92a7c3f3e710123e4b""public""2026-11-20T21:00:59.517+00:00""1""public""438adb0b2f4f4933a55413d2a7e09018""0"4"0""2026-11-20T21:00:59.517+00:00"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f4d8fcf758644e7ead926156453daa2e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.