UPDATE 04
Updated RFI response doc attached
Updated Attachment 01
END OF UPDATE 04
UPDATE 03
Site Visit minutes attached
Updated RFI response doc attached
Updated statements of requirements attached (based on responses in RFI doc).
END OF UPDATE 03
UPDATE 02
RFI and Response document updated/attached
Attachment's 01, 02, 03, 04 and 07 have revisions (based on responses to RFI's)/attached
IMPORTANT NOTE: SAM.gov should be monitored, for updates. Duplicate questions are being asked, which means system is not being monitored (and could lead to missing out on updates or important information).
REMINDER: contractor access form needs to be submitted NLT 04 Sep/1:00pm EST, in order to be able to attend site visit.
END OF UPDATE 02
UPDATE 01
Request for Information (RFI) and Response document attached.
Attachment 01, page 03 updated to correct quote due date (24 Sep 26/1:00pm EST).
END OF UPDATE 01
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO FAR Part 12. This announcement constitutes the only solicitation for this requirement. Offers are being requested and a separate written solicitation will not be issued.
Solicitation number W50S8R26Q0037 is issued as a Request for Quotation (RFQ) for the following:
CLIN 0001: MOBILE FENCING (material purchase only)
CLIN 0002: BASE SIGNAGE (materials purchase and installation)
CLIN 0003: GAZEBOS (material purchase and onsite assembly)
This solicitation is a 100% small business set-aside. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
Additional Information:
NAICS Code: 238990 (All Other Specialty Trade Contractors)
Small Business Size Standard: $19 mil
The 179th CW/MSC intends to award a firm-fixed-price purchase order. All responsible sources may submit a quotation, which shall be considered by the agency. The contractor shall provide all labor, equipment, materials, tools, parts, shipping, and all other items necessary to provide for the items listed in Attachment 01_RFQ for Mobile Fencing, Base Signage, Gazebos. See all attachments for pertinent details.
List of Attachments:
Attachment 01: RFQ_Mobile Fencing, Base Signage, Gazebos
Attachment 02: Clauses and Provisions
Attachment 03: Mobile Fencing_Statement of Requirements
Attachment 04: Base Signage_Statement of Requirements
Attachment 05: Base Signage_Building Sign Example
Attachment 06: Gazebos_Statement of Requirement
Attachment 07: Gazebos_Map Location
Attachment 08: Contractor Access Form
The contractor shall provide all labor, equipment, materials, tools, parts, shipping, and other items necessary to deliver: CLIN 0001 – mobile chain-link fencing (800 total ft of 8 ft tall panels, 1 vehicle gate, 38 reusable 30 lb anchor weights, 810 ft of Block 80 wind-resistant privacy screening, and 16 weather-resistant caution signs); CLIN 0002 – 184 flush-mounted, non-reflective, non-illuminated building signs (8"H x 16"W, aluminum construction, black background with white lettering) installed on 26 buildings; CLIN 0003 – three prefabricated 16' octagon vinyl or composite gazebos with raised flooring, built-in benches, and dark brown metal pitched roof, delivered and assembled at three locations on base. Assembly of fencing will be performed by the 179th CW/CES; the Government will remove any existing signage before installation of new signs.
We post new decks and porches opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"44903-8049""MANSFIELD""OH""USA""KO FOR OHANG DO NOT DELETE""1947 HARRINGTON MEMORIAL RD""RFI and Response Document (as of 10 Sep 26).pdf"125483"file"".pdf""1""2026-09-10T16:54:29.246+00:00""0923dba534e34e58bd0773fdcf607442""public""0""public""56b2fc9e2f734cfbafaf700277085d16""0"24"0""Attachment 01_RFQ_Mobile Fencing_Base Signage_Gazebos_rev02.pdf"199620"file"".pdf""1""2026-09-10T16:54:29.246+00:00""23884a37f9284e2cbad6931e202fb156""public""0""public""7a1e374ec326405b8059940c742bf76d""0"23"0""RFI and Response Document (as of 08 Sep 26).pdf"116233"file"".pdf""1""2026-09-08T19:55:08.159+00:00""55724749977b474e973f539b4b58691e""public""0""public""1ca8e0d6f44344b3985b34e5130288b0""0"22"0""site visit minutes_base signage_gazebos.pdf"120392"file"".pdf""1""2026-09-08T19:55:08.159+00:00""055e3bd5ab314244b8112689101b131c""public""0""public""6473e5b8ce8b4fc4a12e093748d37fe5""0"20"0""site visit sign in sheet.pdf"39896"file"".pdf""1""2026-09-08T19:55:08.159+00:00""4fbf636d6c5e41b4b1033bd2f8c9235c""public""0""public""4cef78c38cc34711a0aebf0a8da84aad""0"19"0""Attachment 03_Mobile Fencing_Statement of Requirement_rev02.pdf"206675"file"".pdf""1""2026-09-08T19:55:08.159+00:00""2d5ae40ec27f434a8aa1113b041c8aba""public""0""public""7e379d60c3ca4dd1acc7454df30e29d4""0"18"0""Attachment 04_Base Signage_Statement of Requirement_rev02.pdf"188085"file"".pdf""1""2026-09-08T19:55:08.159+00:00""e68c2f8762b445b3b540804ea74da457""public""0""public""c7518f3c4f074cc38ce769dc0b21d8bb""0"17"0""Attachment 06_Gazebos_Statement of Requirement_rev01.pdf"226750"file"".pdf""1""2026-09-08T19:55:08.159+00:00""287af25532e048d180d1f9d9593f5041""public""0""public""563db630adde4e28bc6b5771182480a3""0"16"0""RFI and Response Document (as of 02 Sep 26).pdf"107538"file"".pdf""1""2026-09-02T15:37:30.815+00:00""b6e7a46ab188410f8c26b028ab713846""public""0""public""a25eacad28d84abaa8dec453f8251377""0"15"0""Attachment 01_RFQ_Mobile Fencing_Base Signage_Gazebos_rev01.pdf"244652"file"".pdf""1""2026-09-02T15:37:30.815+00:00""aafb108802da44da98472602b2342531""public""0""public""308119fda74342a5a42c108eb30e79a8""0"14"0""Attachment 02_Provisions and Clauses_rev01.pdf"145285"file"".pdf""1""2026-09-02T15:37:30.815+00:00""54bcce9c1bb544d2b65dee66893d0f63""public""0""public""5c37790ba634402886ec27dd88ecbb89""0"13"0""Attachment 03_Mobile Fencing_Statement of Requirement_rev01.pdf"206624"file"".pdf""1""2026-09-02T15:37:30.815+00:00""f3a2d762f3684f0ba1496e3c846d80f8""public""0""public""ba4dfd256e23464f86b8721585e81163""0"12"0""Attachment 04_Base Signage_Statement of Requirement_rev01.pdf"188134"file"".pdf""1""2026-09-02T15:37:30.815+00:00""d3f345e0b59e48a9a7221828f23d1dfc""public""0""public""a83ba9389361438f9f75469c34711011""0"11"0""Attachment 07_Gazebos_Map Location_rev01.pdf"1072868"file"".pdf""1""2026-09-02T15:37:30.815+00:00""ffa36281a268410188f0cecd9c0f5555""public""0""public""6c1d846bbd64434fb2e007de8b490528""0"10"0""RFI and Response Document (as of 31 Aug 26).pdf"56843"file"".pdf""1""2026-08-31T17:58:02.175+00:00""8e70566331734181974b997967b6912a""public""0""public""4ff782907b7b40f7a4590522f4e77fd3""0"9"0""Attachment 08_Contractor Access form.pdf"292258"file"".pdf""1""2026-08-28T15:44:02.186+00:00""c3f9f49df50c46dc8947c34196599a24""public""0""public""0c9ad65ef1174c5299629400705aa6b9""0"8"0""Attachment 07_Gazebos_Map Location.pdf"1063494"file"".pdf""1""2026-08-28T15:44:02.186+00:00""a1a71ca43d3641f586ebec8c8c8eea59""public""0""public""9e4f6f8ca275403587885af87622fd4c""0"7"0""Attachment 06_Gazebos_Statement of Requirement.pdf"226110"file"".pdf""1""2026-08-28T15:44:02.186+00:00""b4f7dc9a774044bda1ece7282a928873""public""0""public""16c72251da9c4d5695749e7e2b599511""0"6"0""Attachment 05_Base Signage_Building Sign Example.pdf"19365"file"".pdf""1""2026-08-28T15:44:02.186+00:00""6e7b4ffd7bc64110ac28608a639c7199""public""0""public""de733ee1da094699a0c8ce358eab6ffd""0"5"0""Attachment 04_Base Signage_Statement of Requirement.pdf"188140"file"".pdf""1""2026-08-28T15:44:02.186+00:00""f064003b77c34159ba6f225c7c61a176""public""0""public""8bab5bb6a52546c9bafed50641fc52d5""0"4"0""Attachment 03_Mobile Fencing_Statement of Requirement.pdf"206519"file"".pdf""1""2026-08-28T15:44:02.186+00:00""40c4bb4f3110400a88fa794b754243eb""public""0""public""8497c5601fd34fff873785fddf86b32d""0"3"0""Attachment 02_Provisions and Clauses.pdf"23767"file"".pdf""1""2026-08-28T15:44:02.186+00:00""ead076dd7ace4a1d9aee34e47b2242b8""public""0""public""306fe5275fcc49f48bdc8f3cd7dde1e3""0"2"0""Attachment 01_RFQ_Mobile Fencing_Base Signage_Gazebos.pdf"140326"file"".pdf""1""2026-08-28T15:44:02.186+00:00""e28df0bc8d624356b2756e99fbff7248""public""0""public""aa96723f35284c99b4fcc8a4969565f4""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice f376e41712c44cc38da75fa970e606c8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.