AMENDMENT 0001
Updates key dates for the Site Visit, RFI's, and Quote Due date.
The contractor shall provide all personnel, equipment, tools, materials, supervision and other items and non-personal services necessary to install the exterior motorized vehicle gate on the south side of building on the road leading to the back east side of property that houses maintenance shops, fire offices and fire apparatus. The gate shall match the existing sections of fence on either side of the vehicle gate in appearance. The gate shall be powerful enough to withstand multiple opening and shutting actions throughout the day and shall be connected to the card reader equipment that is already existing on the Northwest side of gate.
The contractor shall provide all personnel, equipment, tools, materials, supervision and other items and non-personal services necessary to install the exterior motorized vehicle gate on the south side of building on the road leading to the back east side of property that houses maintenance shops, fire offices and fire apparatus. The gate shall match the existing sections of fence on either side of the vehicle gate in appearance. The gate shall be powerful enough to withstand multiple opening and shutting actions throughout the day and shall be connected to the card reader equipment that is already existing on the Northwest side of gate. The work includes removal and proper disposal of old fencing materials, installation of a 50 ft long motorized vehicle gate to match existing fence, and installation of a chain-fed 1/2 HP Lift Master motor equipped with pressure loops to automatically open the gate on the east side.
We post new exterior installation opportunities in New Mexico as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""127EAX26Q0090_Amd_0001.pdf"129319"file"".pdf""1""2026-08-31T20:37:32.454+00:00""9082d334a84c4cb98b7db2660cfcc10e""public""0""public""46817791bb2d4318b00b556ac7c33f2e""0"5"0""127EAX26Q0090 Vehicle Gate Replacement.pdf"314078"file"".pdf""1""2026-08-17T18:41:23.924+00:00""9e4efdecfaea4ebb9977ff1a8b90f37e""public""0""public""85a1c798ed784984b7160e0fab24ba4e""0"4"0""Attachment 1 - Statement of Work.docx"57149"file"".docx""1""2026-08-17T18:41:23.924+00:00""0ea0dcba565b42ceb143e29880b366a3""public""0""public""aaf903a24fd84fc4a317231e91a57b5c""0"3"0""Attachment 2 - Schedule of Items.docx"38655"file"".docx""1""2026-08-17T18:41:23.924+00:00""b3eab0491cb646a98feab9f35c2232db""public""0""public""6333051d835043d6b1f828e1201dcbd1""0"2"0""Attachment 3 - Wage Determination.pdf"207480"file"".pdf""1""2026-08-17T18:41:23.924+00:00""ae83da061f29465a8290f0724b2523c6""public""0""public""de6afcc57a754fecaddce491d441c8f5""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 21f138942f6e4a3bb78b9e3e2932c174), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.