09/16/2026 - See Request for Proposal with attachments.
The contractor shall provide all personnel, equipment, materials, and supervision necessary to perform a design-build project including a complete assessment, demolition, and replacement of two existing Evapco cooling towers (Model: AT 424-936) and one BAC cooling tower (model VXT-800CR), associated structural steel platform, roofing replacement, structural components, mechanical components, electrical components, pumps, motors, piping, chemical feed, fire/smoke detector system, condenser water motor/pumps, electrical circuit breaker, piping insulation, SCADA integration, and associated control systems. The contractor shall also provide as-built drawings, updated schematics, integration and SCADA commissioning, demolition and disposal reports, and equipment submittals. The work shall be performed at BEP DCF, 14th & C Streets, S.W., Washington, D.C.
We post new general contractors opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20228""WASHINGTON""DC""USA""14TH&C STREET, SW""2031ZA26R00027.pdf"1680242"file"".pdf""1""2026-09-16T19:43:34.792+00:00""57a82b4f138748eeae2d39de43fe8cef""public""0""public""415167496b3043bf842a518a59da12e1""0"16"0""Attachment 1 - Past Performance Questionnaire.pdf"418472"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8744f8ae3db64f9c9020dd57553a3afe""public""0""public""f9d6c26c949e42ab8033497b3f21de3e""0"14"0""Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf"3539790"file"".pdf""1""2026-09-16T19:43:34.792+00:00""744890ad6fd646cb993dc8e9211a0c14""public""0""public""69479c2d250442129489d68a58425b33""0"13"0""Attachment 3 - Statement of Work - Cooling Towers.pdf"890407"file"".pdf""1""2026-09-16T19:43:34.792+00:00""56ba35c49e23415d803abea7f2405b53""public""0""public""c4f85e8fbba34c83956c8f8878403d0f""0"11"0""Attachment 4 - Pricing Table.pdf"256018"file"".pdf""1""2026-09-16T19:43:34.792+00:00""2e310a832ac642d69f1266a362cfb2d2""public""0""public""c3c89cebba0742599f9262054053b8a2""0"10"0""Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf"1158966"file"".pdf""1""2026-09-16T19:43:34.792+00:00""3892fdfa87844141a979f31a09c63df4""public""0""public""c225d6a69ec2469cbad91869ff0c3361""0"9"0""Attachment 6 - Initial Staffing Plan.pdf"70534"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8cd49c8c2ed04704b64314df4950765d""public""0""public""e2ccc098fe7844a48b1b60ba7b7597c9""0"3"0""Attachment 7 - Monthly Workforce Report.pdf"75844"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8f8629ee63c54ba09f576e5e7c3fd870""public""0""public""c8ae2b0bb91a4bd5b5a242dce859b3b0""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f2f8f52c75c04ef08312066ba0a7555d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.