24NOV26: The offers due date has been pushed to Tuesday, 01 December 2026, NLT 1:30 PM CST. Updated documents are attached to this notice. Be advised to thoroughly review all documents and submit offers/quotes accordingly. Thank you.
19NOV26: The offers due date has been pushed to 30 November 2026, NLT 1:30 PM CST for now. Further changes including Q&As are forthcoming. Thank you.
29OCT26: Grand Forks AFB, ND is seeking to replace existing, and procure & install two 8-ton Computer Room Air Conditioner (CRAC) system along with preventative and emergency maintenance & repair services consistent with the PWS attached to this notice. Please review all attachments to this notice for complete details.
The contractor shall decommission and remove the existing CRAC unit, pumps, and dry cooler, then procure and install two new 8-ton CRAC units with redundant dual-system configuration, new dry coolers, pumps, piping, and flexible ductwork. The contractor must maintain internal temperature and humidity thresholds, provide OEM documentation and on-site training, perform monthly preventative maintenance, and provide 24/7 emergency repair response within two hours for up to three years of option periods plus a six-month extension.
We post new hvac opportunities in North Dakota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"58205-6436""GRAND FORKS AFB""ND""USA""CP 701 747 5252""295 STEEN BLVD BLDG 242""Amendment 1 Combo FA465927QM001.pdf"210437"file"".pdf""1""2026-11-24T22:30:32.437+00:00""b98e6ec3694a4fab8fa940a2f5e00b57""public""0""public""c0662b07e2a44047ad76646c413325ad""0"13"0""Atch1_Quote_Schedule_V2_23NOV26.xlsx"11034"file"".xlsx""1""2026-11-24T22:30:32.437+00:00""a7f42bfa975a425c80223fc71de43ea5""public""0""public""41ebbc6102144fb3ad5ec0329de50438""0"12"0""Atch6 Past Performance List of References.pdf"71509"file"".pdf""1""2026-11-24T22:30:32.437+00:00""d04d683ed04b4ddc804f4be53036f04d""public""0""public""ec1aa48c1e2042b3b59f1b6ab0f4a47d""0"11"0""QAs Combo FA465927QM001 Final.pdf"9417897"file"".pdf""1""2026-11-24T22:30:32.437+00:00""31585e75edcc4719af6f420d9f0370fa""public""0""public""db51d885ced842bd8c1ae5d9fb0586c9""0"10"0""Combo FA465927QM001 CRAC Units.pdf"227545"file"".pdf""1""2026-10-29T21:38:47.093+00:00""3d5c20f91a584a50995577b1ef327f48""public""2026-11-24T22:30:32.437+00:00""1""public""d96c94fa7ab84cd980312ee994fc0aef""0"6"0""2026-11-24T22:30:32.437+00:00""Atch1 Quote Schedule 29Oct26.xlsx"10776"file"".xlsx""1""2026-10-29T21:38:47.093+00:00""fad67d959997467185e902ba5566c658""public""2026-11-24T22:30:32.437+00:00""1""public""da7905834715427ba3208e284e0a11a5""0"5"0""2026-11-24T22:30:32.437+00:00""Atch2 PWS CRAC Units for MCE 1211.pdf"283564"file"".pdf""1""2026-10-29T21:38:47.093+00:00""05a6033e15a741399c9aa2c68e859d41""public""0""public""c40f67f44c4c4c4cb309f6da0f3502bc""0"4"0""Atch3 Provisions and Clauses.pdf"39310"file"".pdf""1""2026-10-29T21:38:47.093+00:00""e8be5db404894e94b91197478bca33e2""public""0""public""dc5c1e8c678643cfb14e5b653826a243""0"3"0""Atch4 SCA WD.pdf"46879"file"".pdf""1""2026-10-29T21:38:47.093+00:00""8dc81af602454d63b992eb489cd51298""public""0""public""62ed67c6b6aa4c08b234acca1e627060""0"2"0""Atch5 DBA WD.pdf"39364"file"".pdf""1""2026-10-29T21:38:47.093+00:00""395a182278354ae39796c12f49a6b466""public""0""public""d5bd03cbbdc2484ba0b3adb893b9c186""0"1"0"Most North Dakota work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f2af796b70e54247a71e76f295db8821), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.