512A5-22-700 EHRM Infrastructure Upgrades at the Perry Point Veterans Administration Medical Center
in Perry Point, MD
The contractor is required to provide all labor, project management, materials, tools, supplies,
and equipment as required by drawings and specifications to complete the necessary work for EHRM construction
Project 512A5 -22-700 infrastructure upgrades.
The location of the project is:
361 Boiler House Road Building 361 Perry Point Perry Point, MD 21902-1103
VAAR Construction Magnitude for this project is between $30,000,000 and $40,000,000
NAICS - 236220 Commercial and Institutional Building Construction SBA Size Standard - $45.0M
Period of Performance: 730 Calendar Days after receipt of the Notice to Proceed.
In accordance with 38 U.S.C. . § 8127 (Public Law 109-461),this project is a competitive
Service-Disabled Veteran-Owned Business (SDVOSB) Set-Aside.
One site visit is scheduled for 12/8/2026 at 9 am (local) EST. VA Medical Center (VAMC) - 361
Boiler House Rd, Perry Point, MD
Meet at Bldg. 82H, Second Floor, Suite 226 (Conf. Rm). See site map Atch 7.
POC: Dapo Lajubutu, Healthcare Engineer. 443-220-1323.
Contact is authorized strictly for site visit info.only
All offerors are responsible for monitoring & downloading any amendments from contract
opportunities at the following: https://sam.gov/content/opportunities. Amendments shall be
acknowledged on page 2 of the SF 1442 documents.
The contractor is required to provide all labor, project management, materials, tools, supplies, and equipment as required by drawings and specifications to complete the necessary work for EHRM construction Project 512A5-22-700 infrastructure upgrades. The contractor shall completely prepare the site for building operations, including demolition/removal of existing structures, and furnishing labor and materials to perform work as required by the drawings and specifications.
We post new general contractors opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""S02 Solicitation RFP 36C77626R0118.pdf"1299232"file"".pdf""1""2026-11-18T19:27:19.502+00:00""93fe8a35b5484f68859e54fd8793323b""public""0""public""3decd30fcedc446db3e3dafc5d036999""0"16"0""S02 Atch 1 Specifications R1 512A5-22-700 EHRM Perry Point.pdf"42838578"file"".pdf""1""2026-11-18T19:27:19.502+00:00""1dbca2e797a845959c1a7953ed8b75a7""public""0""public""1bfad8961026462b9398e0395e3738ef""0"15"0""S02 Atch 2 DWGS-VOL-1-of-3 512A5-22-700 - EHRM Perry Point.pdf"235260752"file"".pdf""1""2026-11-18T19:27:19.502+00:00""65e4723c4cc84308b891bcdf1ad702c1""public""0""public""476c8055ac3c46aebfa5bf2959cd15c7""0"13"0""S02 Atch 3 DWGS-VOL 2-of-3 512A5-22-700 - EHRM Perry Point.pdf"126930858"file"".pdf""1""2026-11-18T19:27:19.502+00:00""c7d6e7c7067946e58816c9e7abd9eab8""public""0""public""d93919ae33c94d08bc212d6c46b801a1""0"11"0""S02 Atch 4 DWGS-VOL-3-of-3 512A5-22-700 - EHRM Perry Point.pdf"156140805"file"".pdf""1""2026-11-18T19:27:19.502+00:00""a97dcc871b8f44df80d2871ca7afb335""public""0""public""6aff4c79260e42348684cc449ea4102d""0"9"0""S02 Atch 5 - Limitations on Subcontracting - Construction.pdf"138773"file"".pdf""1""2026-11-18T19:27:19.502+00:00""1d53999ca51e472f82823dfa312731f0""public""0""public""022b8b12d12147b1be1eefcb51ee7240""0"7"0""S02 Atch 6 Wage Determination Decision.pdf"1930280"file"".pdf""1""2026-11-18T19:27:19.502+00:00""49547da87fc040bab3b3beb9d2222394""public""0""public""447fba42e1734f48973f96661aaf146a""0"5"0""S02 Atch 7 Perry Point Site Plan Map_Site Visit_Directions to Bldg 82H.pdf"3760748"file"".pdf""1""2026-11-18T19:27:19.502+00:00""6a749dd691614023b9b4ba850a82f1bf""public""0""public""a262839994ff492696b7aa39b1eb1ad6""0"3"0""S02 Atch 8 Brand Name Justification - Perry Point.pdf"743387"file"".pdf""1""2026-11-18T19:27:19.502+00:00""470e67a25cc54909bbe0bed847bb8305""public""0""public""669fedcd49f449aea6527febbde46af4""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f254169aa279439cba42e57fa1ec5c2f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.