Non-personal services for seawater pump renovation at the oyster breeding center, electrical and plumbing components present. See attached Statement of Work for details.
The scope of this project is the complete decommissioning of existing system, and procurement, installation, and wiring of a new corrosion-resistant salt water pumping system and its supporting electrical distribution and plumbing infrastructure. The Contractor shall furnish all labor, materials, equipment, transportation, and supervision required to execute the following transitions: Removal of legacy disconnects, starters, wiring troughs, wiring, breakers, enclosures and plumbing piping; Procurement and installation of a Vanton Chem-Gard® non-metallic horizontal centrifugal pump assembly or equivalent; Installation and configuration of four (4) active WEG variable frequency drives (VFDs/Inverters) and associated NEMA 4X enclosures or equivalent; Upgrading local field instrumentation, current transducers, and electrical distribution wiring; Delivery of required on-site backup components (Two spare impellers, one for each pump model) directly to facility inventory.
We post new electrical opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98115""SEATTLE""WA""USA""WESTERN ACQUISITION DIVISION""7600 SAND POINT WAY NE BLDG 1,""Attachment 2 - Davis-Bacon Act WD MA20260001.pdf"68405"file"".pdf""1""2026-11-10T20:07:57.95+00:00""9699746dbd39498ca997031e316eb80f""public""0""public""427849702eda4a8e80445dba0b7caa4e""0"6"0""Attachment 4 - Past-Performance-Questionnaire 1305M327Q0034.docx"4532809"file"".docx""1""2026-11-10T20:07:57.95+00:00""cc750b01886e484894fa97c53d35a3cf""public""0""public""fff8ea18aa2948f8aa7ad356978e9c95""0"5"0""Sol_1305M327Q0034.pdf"347065"file"".pdf""1""2026-11-10T20:07:57.95+00:00""a11b555f15f640dc969197b7a08227ea""public""0""public""fb61c5cacd234c9ab32b1b27291adc5b""0"4"0""Attachment 01 - Statement of Work.docx.pdf"252266"file"".pdf""1""2026-11-10T20:07:57.95+00:00""da5f1477828143da922dc6c9c7fe9bb4""public""0""public""80618ec4895c4089886095067b460d41""0"3"0""Attachment 5 - Local Subcontracting Options.pdf"191801"file"".pdf""1""2026-11-10T20:07:57.95+00:00""d0d7b39f78bf4c9f8be83229b7fcaae0""public""0""public""abf6dd88e2cc4b2f995c12f685dc37ca""0"2"0""Attachment 3 - RFI Tracker 1305M327Q0034.xlsx"12834"file"".xlsx""1""2026-11-10T20:07:57.95+00:00""b8b63613eb2c42a690889aa06ded1f61""public""0""public""925de7a17642485ba5485e894e66ed0d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f070889d4f8249b8bb550a7b8c1566ce), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.