Please see the attached IFB and supporting documents
Site Visit 10/6/26 at 9:0am
The contractor shall furnish all materials, supplies, equipment, personnel and supervision for Project #620A4-25-201 Brick Replacement and Tuckpointing at building 13. Work includes general construction, alterations, necessary removal of existing roof, exterior staircases & façade areas and construction and certain other items, including line items for specific materials and assembly. The contractor shall completely prepare site for building operations, including demolition and removal of existing deteriorated façade masonry and masonry joints, masonry exterior egress stair cases, roof materials for Building 13 and abatement of hazardous material on façade and roofs, and furnish labor and materials and perform work for masonry repairs, structural staircases reconstruction and new roofing and storm drainage on Building 13 as required by drawings and specifications.
We post new carpentry/glaziery opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""Brick and Tuckpointing Attachment A - Identification Card Process.doc"56320"file"".doc""1""2026-10-01T12:37:02.929+00:00""f14b1100ab6b41b3b1b7761a318dde55""public""0""public""a1862bcc195c4b0b89a584f5e8991c3f""0"9"0""620A4-25-201 Flash Badge Process Notification.doc"56832"file"".doc""1""2026-10-01T12:37:02.929+00:00""45b59fa93ba74914a8148c91f08a0d6d""public""0""public""e57a06cae7df472792c9113bb5bebdbb""0"8"0""852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf"104668"file"".pdf""1""2026-10-01T12:37:02.929+00:00""d92b0e558b744710b5476b4241ae1898""public""0""public""5dd3653af02a40ad996621907ab01cbf""0"7"0""FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx"14997"file"".docx""1""2026-10-01T12:37:02.929+00:00""091f8e51c6334a0e9ef8babcf79c2855""public""0""public""d25ffef55ca847e2b99819aada9fa510""0"6"0""Wage Determination - Dutchess County.pdf"90059"file"".pdf""1""2026-10-01T12:37:02.929+00:00""1be6e4b504234d8ca069b03c5f79a71f""public""0""public""003b3b1aae80411d832e5dc67751a9a2""0"5"0""620A4-25-201 Specifications Manual 04-30-26.pdf"3967422"file"".pdf""1""2026-10-01T12:37:02.929+00:00""cf3977fdf3da4f6896a572513bd79ccf""public""0""public""bd0b52b00dda4fccb64c76a405c566fa""0"4"0""05-01-26_620A4-25-201_VA CP Bldg 13_100pct S-S Sub_Part2.pdf"16415780"file"".pdf""1""2026-10-01T12:37:02.929+00:00""6e3ed1ec72634b90ad6a5abe3ff4bee5""public""0""public""796b8335ff1c4f7b85153a69d716216e""0"3"0""05-01-26_620A4-25-201_VA CP Bldg 13_100pct S-S Sub_Part1.pdf"15102240"file"".pdf""1""2026-10-01T12:37:02.929+00:00""25b3d3a30a52419b948433375eacab0c""public""0""public""254f2bbb073c40e39ebb0fb77354368b""0"2"0""36C24227B0002_1 Brick and Tuckpointing Castle Point.pdf"758678"file"".pdf""1""2026-10-01T12:37:02.929+00:00""bbe7cea2eab14753beb71b928dcb10f9""public""0""public""64e5a473db404d85b5b8380d44480a96""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f05f3f401fe94cd1bbcb453b7d11b345), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.