The Contractor shall provide all materials, parts, travel, tools, and labor necessary to provide and install a new hoist carriage assembly to the Maintenance Support Group (MXSG); Warner Robins Air Logistics Complex (WR-ALC) at Robins Air Force Base (AFB), Georgia.
This is a solicitation for noncommercial products or noncommercial services prepared in accordance with RFO Part 13. RFO 13.201, Procedures, states that Request for Quotations (RFQ) follow Simplified Acquisitions Procedures listed in RFO 12.201-1.
This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued.
Solicitation number FA857127Q0021 is issued as a RFQ for the procurement of AMFF LINE1 CRANE 2 REPLACEMENT. Quotes are hereby due by 4 December 2026, at 12 PM EST.
This acquisition is issued as a sole source award to George Koch Sons, LLC (CAGE: 34123) as the OEM and Proprietary Owner of all calculations, engineering drawings, software, and design methodologies.
Government Estimated Award date is NLT 28 December 2026.
The contractor shall provide all materials, parts, travel, tools, and labor necessary to provide and install a new hoist carriage assembly to the Maintenance Support Group (MXSG); Warner Robins Air Logistics Complex (WR-ALC) at Robins Air Force Base (AFB), Georgia. The work includes removing the old hoist, removing two cameras from the current hoist and installing them on the new hoist, installing the new hoist, assembling customer-supplied skate columns onto the new hoist, installing new skate column limit switches, installing the customer-supplied pick-up bar, assembling the lift cables, installing a government-supplied rail-mounted work basket, removing the work basket when work is complete, and providing an input/output test to check the electrical systems and verify the operation of the hoist.
We post new it & software opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"31098-1672""ROBINS AFB""GA""USA""CP 478 926 7509""235 PERRY ST BLDG 255""Solicitation Amendment FA857127Q00210001 SF 30.pdf"389663"file"".pdf""1""2026-11-20T16:11:13.182+00:00""88823b4da1b649968d6bb6ffa308c4c7""public""0""public""69883e5169f3430fa8c8530fbda16196""0"8"0""Solicitation - FA857127Q0021.pdf"647419"file"".pdf""1""2026-11-19T05:22:46.256+00:00""bd2b60a29e454366a1a4aa84a9884aa8""public""0""public""1521b4d9d8bd451790c2d3a33243968d""0"7"0""CDRL A004- Accident Incident Report.pdf"249233"file"".pdf""1""2026-11-19T05:22:46.256+00:00""2501ee68381148569486028a3e224775""public""0""public""96d25f59e4044d058d2c9898da05fca9""0"6"0""CDRL A003- Contractors Safety Plan.pdf"247482"file"".pdf""1""2026-11-19T05:22:46.256+00:00""6f4023f1258f4abfa35d4dfdb4375b11""public""0""public""6d994eb145774db484fc5726f4077695""0"5"0""CDRL A002- Status Report_EnMS Training.pdf"247778"file"".pdf""1""2026-11-19T05:22:46.256+00:00""9ad2eb5465204bae85c8d541d86553db""public""0""public""ac49d28ae24c4de099d60e52a25112a1""0"4"0""CDRL A001- Status Report_EMS Training.pdf"247645"file"".pdf""1""2026-11-19T05:22:46.256+00:00""4d1e2ef61cd84da4a9394174fb2032e1""public""0""public""9075314ebba041ee9cdcbf30d84e4fd8""0"3"0""82115- PD-AMFF LINE1 CRANE REPLACEMENT 19 Oct 2026.docx"42974"file"".docx""1""2026-11-19T05:22:46.256+00:00""a973f2a831f74f82a4a971ef043a358c""public""0""public""1d5d5070529d4464ba54850f480b3e73""0"2"0""82115-Appendix C -PD 82115-AMFF LINE 1 CRANE 2 REPLACEMENT.docx"78588"file"".docx""1""2026-11-19T05:22:46.256+00:00""0ce2082e612e442b86bb626373202219""public""0""public""96df55d153d5498fba2ae6d0a3023cd6""0"1"0"Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ef93cb126800433a84a35bbe03fdb0b0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.