This requirement is for the purchase and install on a 2027 RAM 2500 (Tag number G62D1940 , VIN# 3C6UR5HJ6VG371482). All equipment must be covered by the manufacturer’s warranty. All items shall include standard warranty. Repairs will be completed in accordance with industry standards. Vendors shall be following all EPA and OSHA standards and requirements. SDS and any other required documents must be on site. Vendors must be properly insured to cover any losses for GSA vehicles that are in their shop. Valid business license(s) is required in accordance with state and local guidelines. All employees of selected vendor must be paid in accordance with local Department of Labor established wages. Please see Bill of Materials (BOM).
BOM:
This does not have to be brand specific, part numbers are provided as a base/measuments SNOW PLOW: BLADE CRATE (SNOWPLOW),8'-10' EXT STB - STB19200 PLOW BOX,STR,EXT,CFT,SL4 - STB25545 UC/RT3,RAM 2500/3500,19+ - LTA15400B KIT CONTROL,HANDHELD,UNIVERSAL,C FT,12V MSC25015 KIT-WIRING, VEHICLE, CAN, 12V - MSC25016 HARNESS-WIRING,RAM 2500-5500,25MY+,CFT - MSC28020 BRKT-MOUNT, CONNECTOR, PWR/CTRL [BLACK] - MSC26035-03 SALT SPREADER: PINTLE KIT-CONTROL, LCD DISPLAY - VBS22630 INVERTED V,W/HARDWARE,VBX 8000 - 9000
The contractor must purchase and install a snow plow system (blade crate, plow box, mounting kit, control kit, wiring kit, harness, and bracket) and a salt spreader (pintle control kit and inverted V with hardware) on a 2027 RAM 2500 (Tag G62D1940, VIN 3C6UR5HJ6VG371482). All equipment must be covered by the manufacturer's warranty, repairs must follow industry standards, and the vendor must comply with EPA and OSHA standards. The vehicle is located in Morgantown, WV, and the vendor must have a repair facility within 50 miles of that location. Delivery must be completed no later than 120 days after receipt of order.
We post new equipment maintenance & rental opportunities in West Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20405""WASHINGTON""DC""USA""1800 F ST NW""G62D1940_COMBINED_SYNOPSIS_SOLICITATION.pdf"694770"file"".pdf""1""2026-11-13T16:36:29.884+00:00""88514204135a4feeb4cd9eb33e89c84e""public""0""public""85851042a59d412196be62c023eae3ef""0"1"0"Most West Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ee5d3a7113504db3a6b6b9cd6848b710), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.