The purpose of this amendment is to provide drawings for floor drain locations. See attachments
The project requires preparing existing floor and cove base surfaces in the Mechanical Services Building second floor laboratory, treating cracks and joints, and applying a base coat of pure epoxy plus a chemical-resistant polyaspartic finish coat with a non-skid texturing additive, covering approximately 2700 SF of floor and 450 linear feet of cove base, along with installation of nine new 4-inch floor drains tied into existing piping, meeting BSL-2 sanitation requirements and withstanding washdown cleaning with chlorinated disinfectants.
We post new flooring opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""20705""BELTSVILLE""MD""USA""5601 SUNNYSIDE AVENUE""C05_Sol_124PCA27Q0008_Amd_0002.pdf"85975"file"".pdf""1""2026-11-23T20:01:57.193+00:00""ed145cb4097e4db98826314b7f2c0aa7""public""0""public""d29571f83cda47d0b2128d431c63ee36""0"9"0""C05_Drain Location Drawings.pdf"905360"file"".pdf""1""2026-11-23T20:01:57.193+00:00""85283dd76b1a4d5cb1ab96d6f8ec9621""public""0""public""86b7114d28ba4996ae4c3c454168daf9""0"8"0""C05_Sol_124PCA27Q0008_Amd_0001.pdf"83853"file"".pdf""1""2026-11-20T19:39:50.345+00:00""d75140e8610f4139bcf1fa575683d463""public""0""public""0b6d3e4a686744758ee03b544491a680""0"7"0""C05_RFIs and Responses to Solicitation 124PCA27Q0008.docx"30879"file"".docx""1""2026-11-20T19:39:50.345+00:00""87d61cdb8393442fac362647635da2be""public""0""public""e8ef258a77614cb8b7da161c5c0990e3""0"6"0""C04_SOWv2.docx"76382"file"".docx""1""2026-11-10T14:12:01.328+00:00""355f354ac2cc42a8ade0cd052228809d""public""0""public""4bd116f439ea4e65a07d06d9ddc70b04""0"5"0""C04_Sol_124PCA27Q0008.pdf"593143"file"".pdf""1""2026-11-09T19:24:56.195+00:00""61d88f55a6d84de7910e5fa49d1893b1""public""0""public""b9d5cb96d85047f6b0158229ac006b4d""0"4"0""C04_Wage Determination.pdf"41831"file"".pdf""1""2026-11-09T19:24:56.195+00:00""77507424e5b04a3b904c2d1736ef9b3c""public""0""public""6ead8e5f542f4159ae34c34b59180049""0"3"0""C04_Drawing.pdf"56787"file"".pdf""1""2026-11-09T19:24:56.195+00:00""954a2c4dca194044a7404d0dccb91b62""public""0""public""a250c806257943ad860e958f90278ac9""0"2"0""C04_SOW.docx"76154"file"".docx""1""2026-11-09T19:24:56.195+00:00""688f54a167d940c29c802c94516dbb3e""public""0""public""64f6ea2e2a8b471ca6dacf07ffec4138""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice edaec52edc34480c8b49cb3f55572967), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.