The Office of Construction and Facilities Management (CFM) has a need to improve seismic conditions at the Marion VAMC in Illinois. The contractor shall provide all planning, labor, materials, equipment, supervision and expertise required for the complete construction of the new boiler plant (Building 14) as well as the demolition and removal of the existing plant, both of which reside on the grounds of the VA Medical Center (VAMC) in Marion, IL. The contractor shall refer to the Project #657-507, Correct Seismic Deficiencies B14 plans and specifications for details on all requirements of construction. All work will be performed in accordance with this SOW, the project documents as well as all applicable local, State, Federal and VA codes and standards.
19 OCT 2026 The purpose of this update is to add directions for the 20 OCT 2026 site visit. See attached strip map word doc
22 OCT 2026 This purpose of this update is to post the Amendment 36C10F26R0085 0001 for posting the site visit roster and sign in sheets.
The contractor shall provide all planning, labor, materials, equipment, supervision and expertise for the complete construction of the new boiler plant (Building 14) and the demolition and removal of the existing plant at the Marion VAMC. The work includes site establishment (0.7 acres, cut/fill, parking, fencing, fuel oil tank yard, utility modifications, roadway realignment, steam tunnel modification/construction); construction of the new plant building (approx. 10,310 sf over three floors, augercast pile and grade beam foundation, structural steel braced frame, reinforced masonry walls, concrete slabs); installation of all building systems (mechanical, HVAC, electrical, telecom, plumbing, fire protection) including three new 250 HP gas-fired firetube boilers with fuel oil backup, diesel generator, medium/low voltage power distribution, water tower pumping/monitoring system, new controls/IT, and fire protection; startup and commissioning of all new plant systems; cutover of all utility services from the existing plant to the new; and demolition of the existing 6,200 sf plant (built 1940, retrofitted 1980s) including teardown, haulaway, and site restoration to green space, with mitigation of hazardous construction materials. Two deductive design alternates are included: deletion of asphalt replacement on East Periphery Drive, and removal of maintenance garage and shop space addition to new plant.
We post new hvac opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20420""WASHINGTON""DC""USA""810 VERMONT AVENUE NW""S04 - Site Visit Sign in Sheet.pdf"523793"file"".pdf""1""2026-10-22T21:40:55.76+00:00""e58b85c71b5344b79be1b821c802c61f""public""0""public""d14c032dcda343a585c622735afa161c""0"12"0""S04 - Site Visit Roster.pdf"42173"file"".pdf""1""2026-10-22T21:40:55.76+00:00""46a7919e6f0b40e59fb623a72516d758""public""0""public""637ec2b55b2d4c33acbf949988536bcb""0"11"0""S02 - 36C10F26R0085 0001.pdf"82367"file"".pdf""1""2026-10-22T21:40:55.76+00:00""d6cd983e506d47b6969675bdcefe9835""public""0""public""d639e0a7141147789afd2b730d7257a1""0"10"0""Instructions for 20 OCT 2026 B14 Site Visit.docx"115506"file"".docx""1""2026-10-19T20:14:33.712+00:00""0f27039d03a54f8c8f6310fc061224df""public""0""public""9ca2fa76a28a493099f6ddbcc390a49f""0"9"0""S02 - 36C10F26R0085_1.pdf"753251"file"".pdf""1""2026-10-07T19:26:15.156+00:00""5f77688c3366445987eefea948875214""public""0""public""a505269c652343e793214b6fd37694ef""0"8"0""S02 - 657-507_VA Marion Seism Defics_Bid Drawings 09-30-2026.pdf"85789848"file"".pdf""1""2026-10-07T19:26:15.156+00:00""408900b2cf4143428d685a403d5c77e7""public""0""public""9f8ba9bfd17b4351a5048db4431840fd""0"7"0""S02 - 657-507_VA Marion SeisDefic_Final Bid Specs 9-1-2026.pdf"12978134"file"".pdf""1""2026-10-07T19:26:15.156+00:00""0bb595571424496d874e37bd94f176e4""public""0""public""a3fc3c4b48ef494e908620e06ded9177""0"6"0""657-507_Marrion_CorrectSeisDef - Appendix-HAZMAT 1.pdf"14084094"file"".pdf""1""2026-10-07T19:26:15.156+00:00""716421c957c148748ed01638c4538024""public""0""public""ef97826cd7f241978d3351971ad3bc3c""0"5"0""657-507_Marion_CorrectSeisDef - Appendix - SHPO MOA 1.pdf"8456216"file"".pdf""1""2026-10-07T19:26:15.156+00:00""cac475059b2b40c292ed5ee4ae58d024""public""0""public""ba65dcb5b7e5494681782e3f920db492""0"4"0""657-507_Marion_CorrectSeisDef - Appendix - Geotech Report 1.pdf"2140409"file"".pdf""1""2026-10-07T19:26:15.156+00:00""7b58a41daef841b694820078fea447cc""public""0""public""15d96759ccdd4cf7a02a1e4e25719b64""0"3"0""657-507_Marion_CorrectSeisDef - Appendix - Geotech Report GMHA Seismic Report 1.pdf"2222553"file"".pdf""1""2026-10-07T19:26:15.156+00:00""bb124f10205c4e94bde750a6f3bfdc1c""public""0""public""f4c052fe3c374521b3583afd253d1454""0"2"0""657-507_Marion_CorrectSeisDef - Appendix - Geologic Hazards Report 1.pdf"1116509"file"".pdf""1""2026-10-07T19:26:15.156+00:00""270d641f668843dab09bd671e842f622""public""0""public""85ab6cfa174c4776953fbb93129c3cba""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ebf9deea3e1140db8e28794ea68d2202), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.