1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
Onboarding Opportunity 1:
Whitepapers Due: Closed
Mandatory Site Visit Window: Completed
Consortium Activation Date: 1 July 2026
Onboarding Opportunity 2:
Whitepapers Due: Closed
Mandatory Site Visit Window: Complete
Onboarding Opportunity 3:
Whitepapers Due: 24 February 2027, 10:00AM CST
Mandatory Site Visit Window: 28 April 2027
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
Atch 3 - CMMC-Information.pdf
Atch 4 - CMMC-FAQsv6.pdf
Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
26 Aug 26 - The following documents were amended:
AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf - Under Section 4.0, Part 2: Technical Competency, Technical Evaluation #16 was added for Solid Rocket Motors and Components
Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf - Objective - Solid Rocket Motors and Componets was added
31 Aug 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf
15 Oct 26: AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf posted and will be the basis for evaluating onboarding 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf was updated by adding the Performer Representation article.
15 Oct 26 - AEDC Velocity Alliance - Request for Whitepaper-Amend 7- 15 Nov 26.pdf posted and will be the basis for evaluting onboard 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Nov 26.pdf was updated & Atch 6 - VAC_RWP_Part_4_Identified_Partner_Self_Certification.pdf was incorprated. AEDC Velocity Alliance Consortium_Q_A-11.15.26.pdf:
Amendment 7 — Summary of Principal Changes
Adds two new Base Articles
Inaccurate 10 U.S.C. § 4022(d) Self-Certification: Establishes that § 4022(d) certifications and supporting information are material; requires prompt notice of material inaccuracies; addresses pre-award and post-award consequences; preserves Government recovery/setoff rights to the extent permitted by law; and applies the existing Termination for Default and Termination for Convenience articles rather than creating a separate termination remedy.
Organizational Conflicts of Interest and Competition Integrity: Establishes requirement-specific OCI disclosure, review, mitigation, and eligibility procedures to protect against biased ground rules, unequal access to nonpublic information, impaired objectivity, and other competitive-integrity concerns.
Establishes the Opportunity 3 onboarding schedule
Whitepaper submission deadline: 24 February 2027
Mandatory Industry Day: 28 April 2027
Opportunity 1 and Opportunity 2 are closed/completed.
Revises how 10 U.S.C. § 4022(d) partnership capability is evaluated at membership entry
The Prime Vendor, not the partner, must complete and sign a separate Attachment 6 self-certification for each identified partner.
The Prime Vendor bears responsibility for the asserted partner’s identity, eligibility status, existing relationship, anticipated role, unique capability, and significant-extent rationale.
This is a membership-entry assessment only. It does not establish a project-specific appropriate-use finding, bind the partner to participate, or replace the separate § 4022(d) analysis, self-certification, and supporting documentation required for each future POA or PLA.
For this RFWP Part 4 assessment, the Prime Vendor may rely only on prospective applicability of Conditions A or B; Condition C cost share and Condition D exceptional circumstances are not available for satisfying the Part 4 requirement.
The Alliance will compete project-level agreements among members for general and industrial construction, low-pressure, high-pressure, hazardous and large-diameter ducting process systems, high-voltage, medium-voltage and low-voltage electrical work, specialized fire suppression, rotating equipment repair, site-wide utilities, solid rocket motors and components lifecycle work, and mechanical, electrical and instrumentation-data-controls engineering services supporting test facilities.
We post new general contractors opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"37389-1332""ARNOLD AFB""TN""USA""CP 931 454 7841""100 KINDEL DR STE A332""AEDC Velocity Alliance Consortium_Q_A-11.15.26.pdf"493271"file"".pdf""1""2026-11-15T22:38:17.679+00:00""655dd937de1941fba1f6ff1b3993d50c""public""0""public""b68c10d6821445c5800b5ba9799c43e9""0"54"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 7- 15 Nov 26.pdf"481001"file"".pdf""1""2026-11-15T22:38:17.679+00:00""c046c3b14eb9424bafc0afde98918f8d""public""0""public""07978f8ad15c49e7a2dd476f29d70cd6""0"53"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 7- 15 Nov 26.pdf"481011"file"".pdf""1""2026-11-15T14:45:09.553+00:00""ae6d8885f4224b5c91aad0df62024d1a""public""2026-11-15T22:38:17.679+00:00""1""public""61374e25b9404e80b4f21ddd825339d3""0"52"0""2026-11-15T22:38:17.679+00:00""Atch 2 - AEDC Velocity Alliance Base Articles - 15 Nov 26.pdf"461428"file"".pdf""1""2026-11-15T14:45:09.553+00:00""7c7cdaeff3e94a709a866ad0282d1265""public""0""public""a5559cfbab5f407f885a5f6fa981331f""0"51"0""Atch 6 - VAC_RWP_Part_4_Identified_Partner_Self_Certification.pdf"127399"file"".pdf""1""2026-11-15T14:45:09.553+00:00""c474a340535a4c649a6656bcce85e5f5""public""0""public""a1aa35061f744999a8da2901f40cbc61""0"50"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf"430697"file"".pdf""1""2026-10-15T15:48:00.579+00:00""e45535100a68498997c0d2d1c4eb6975""public""0""public""d9901b1b4e9343949c2cbe34cfc3f152""0"49"0""Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf"413899"file"".pdf""1""2026-10-15T15:48:00.579+00:00""7f5481ee2eab4adf8c54b507919208e1""public""0""public""f35b1c8402334f5e85604f797fd95dcb""0"48"0""AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf"475788"file"".pdf""1""2026-08-31T17:52:07.33+00:00""754af576f78a43ac9face88cdf7dd3ad""public""0""public""fb1688f7561d410bb73ada3dc20f3a84""0"46"0""Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf"156147"file"".pdf""1""2026-08-26T20:46:46.933+00:00""dbe506fb16b245f5a557fe3fb6cf2e3a""public""0""public""48686dacf3b8436097f12f40502d0fc3""0"45"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf"512332"file"".pdf""1""2026-08-26T20:46:46.933+00:00""2a85223df27b4733a59684d16bca3a13""public""0""public""abf6f809fac64c55b4dd46e089ff221c""0"44"0""AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf"472240"file"".pdf""1""2026-07-17T19:49:28.02+00:00""b1fe383eb61748cb9b132e5d6b5673ae""public""0""public""d40e94e027014a86982309494017c093""0"43"0""Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf"401766"file"".pdf""1""2026-07-17T13:26:25.591+00:00""8735301ec55b4dae8b81f62bb6dc8242""public""0""public""a2538f26045948ff84730a14cda0b0c0""0"42"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf"510320"file"".pdf""1""2026-07-17T13:26:25.591+00:00""9dfb5f912bae4708a2d8685cacefd7c2""public""0""public""a3925f05fffb4c6095e09f18b14251b7""0"41"0""Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf"464704"file"".pdf""1""2026-07-15T19:20:40.262+00:00""30ce66a2c8dc4806b53e1c1583cccfd0""public""0""public""4b92564ed8b54c49bdc1a3019fd07821""0"40"0""Atch 4 - CMMC-FAQsv6.pdf"446494"file"".pdf""1""2026-07-15T19:20:40.262+00:00""784c5ed684d746d69a9e0b90a3c48896""public""0""public""0ef2a0661f974566a057e99a5494f32c""0"39"0""Atch 3 - CMMC-Information..pdf"2039567"file"".pdf""1""2026-07-15T19:20:40.262+00:00""04c30a18bed341b1aa97f71ee4185a43""public""0""public""361e2893815a40f39199ee711406a564""0"38"0""Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf"401500"file"".pdf""1""2026-07-15T19:20:40.262+00:00""0f54c43915484b30af93fac2d9d2189b""public""0""public""b34a1695453842a38ae9b6a435c84479""0"37"0""Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26..pdf"230806"file"".pdf""1""2026-07-15T19:20:40.262+00:00""5c2c5e7690f847d8baa364ab72308066""public""0""public""77cf9483d66742cfbdb087fcf3b2690b""0"36"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf"510893"file"".pdf""1""2026-07-15T19:20:40.262+00:00""14579f08f31a4264a20f2fa5200bdd7b""public""0""public""3c7fd7e41b5e43de8aff5cb0957406a1""0"35"0""AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf"418374"file"".pdf""1""2026-06-24T11:34:40.661+00:00""123dc5b20fef4a6a89357213cbe72777""public""0""public""d5fb5a2436134324be3afeae48942a15""0"34"0""AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf"416086"file"".pdf""1""2026-06-23T18:46:50.679+00:00""7395c0f7ab504786b1fbbd8f62842aae""public""0""public""53d6c985e69e4ba793e1bb83f3ed19e5""0"33"0""AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf"410646"file"".pdf""1""2026-06-14T14:15:28.406+00:00""f1082f2f81e14662a319e7bf0f15a8bb""public""0""public""2351d288facc445e9588ac075d0be40a""0"32"0""AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf"419563"file"".pdf""1""2026-05-26T14:47:24.226+00:00""0541ad9fecda47ea89dcce67653f6e19""public""0""public""f2b3bfd532b14894b013c0e7dc7b64d0""0"31"0""AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf"408261"file"".pdf""1""2026-05-22T11:10:32.718+00:00""2ff11056f2d743f487cc974fe954218e""public""0""public""8866bb0a7aba455a99c20a377abc099c""0"30"0""Atch 5 - UTSI Map.pdf"544280"file"".pdf""1""2026-05-15T19:30:12.931+00:00""5e6340d527de4004a2937688d4364d65""public""0""public""4b39834cdb864a89a6fd348784250982""0"29"0""Summary of Changes-AEDC Velocity Alliance-RWP-Amend 2.pdf"94102"file"".pdf""1""2026-05-15T19:30:12.931+00:00""c75e9fd56d9446dc8722aac95feda81e""public""0""public""e489333ddd1f4ae5bd6cfe8b2b1bc2a4""0"28"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 15 May 26.pdf"417394"file"".pdf""1""2026-05-15T19:30:12.931+00:00""02d7e583df544495b6948eab85735faf""public""0""public""a6bcaeba9c014b5fbafaab5bab5ca362""0"27"0""AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf"401535"file"".pdf""1""2026-05-12T11:04:43.125+00:00""afb75f3257f548369689c3d254acc3f7""public""0""public""67b8317756a8473cb99a34a988665db6""0"26"0""AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf"398181"file"".pdf""1""2026-05-01T19:58:01.793+00:00""91a142b5e8f94aea9229f5305c9e38ad""public""0""public""edde427bbb74438fb954041fe854092e""0"25"0""AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf"392987"file"".pdf""1""2026-05-01T13:14:53.801+00:00""bbd0a4706dc041f5937cff1e8371d8e1""public""0""public""16ccac0f28cc48d58f5f1a981bae6463""0"24"0""AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf"384868"file"".pdf""1""2026-04-30T13:28:26.774+00:00""e691a8acfcb24834b6ab21094887c5f0""public""0""public""8cd4b6cbbe4e459895fd75ae85bd2b75""0"23"0""AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf"378255"file"".pdf""1""2026-04-28T12:43:07.945+00:00""49b6e512f4ee41528a4ab21da9ca6588""public""0""public""47c8ecd66ffe493aa581a5d2ce57bac7""0"22"0""AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf"369576"file"".pdf""1""2026-04-27T11:14:40.303+00:00""df1ccaea144a48aeb206ba6eeeeca1c0""public""0""public""488448c7751a480eb41b7c8f299eea17""0"21"0""AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf"362633"file"".pdf""1""2026-04-24T16:09:16.497+00:00""373191e8b77e4f29b57cc876de557e5e""public""0""public""2a6d5c19ca0f48d3a54c830729f33f10""0"20"0""AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf"355311"file"".pdf""1""2026-04-23T11:57:53.917+00:00""ca451cd4e82f44c18a63a41fdf1b62a5""public""0""public""d78f8a571614467f80d64fa5fb2e2b0e""0"19"0""AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf"329908"file"".pdf""1""2026-04-21T12:13:27.026+00:00""808fc99fcc9844d78e1c802e3ff15e6e""public""0""public""9e2faf6571c0495ba3ac6afb0a70ce6f""0"18"0""Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf"395064"file"".pdf""1""2026-04-21T12:13:27.026+00:00""e68fd463de514ca4aa49caea907db32d""public""0""public""60ac9f59e331441b91b54f103080a6aa""0"17"0""Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf"230806"file"".pdf""1""2026-04-21T12:13:27.026+00:00""8f5349a71db743febf518bdc8d65c504""public""0""public""4d36838acaf8422c8ed2ff38b2b5cc87""0"14"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf"416177"file"".pdf""1""2026-04-21T12:13:27.026+00:00""6b68b11bc59d4e9e8a8503b309701d11""public""0""public""57b785227d8d4e2ca0e458504360a6b8""0"12"0""AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf"313954"file"".pdf""1""2026-04-17T16:57:30.548+00:00""4a86f6b5306e439b97635c7ee3acfb4c""public""0""public""a6d8ee7f7a7d453e9d9c4baf72bc55ca""0"11"0""AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf"308843"file"".pdf""1""2026-04-15T12:17:57.258+00:00""047f9ddfab43403b9c65d0a773c79939""public""0""public""7f9031608be8410599381c49db1e8ff1""0"10"0""AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf"290570"file"".pdf""1""2026-03-31T15:24:05.414+00:00""60cc24ac3484429994fdf9ac40d194e7""public""0""public""347584c70fb14bf59360daec20488b60""0"9"0""AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf"280066"file"".pdf""1""2026-03-31T12:17:40.758+00:00""7ef837e62e5e489ab66953ea77c457bf""public""0""public""462135a4acb94d02a48ea7fed162399b""0"8"0""AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf"223275"file"".pdf""1""2026-03-30T12:27:46.825+00:00""01ec79ef1651463baa4aeff1193675bb""public""0""public""2610b79738d44dc5aeceab048647e0cc""0"7"0""AEDC Velocity Alliance - Request for Whitepaper.pdf"411381"file"".pdf""1""2026-03-18T12:18:19.513+00:00""7e9c63ae16e3434f94293999a6cf01cc""public""0""public""10ede36776fa41b5980eaa7898d5fa78""0"6"0""Atch 4 - CMMC-FAQsv4.pdf"554907"file"".pdf""1""2026-03-17T11:34:05.241+00:00""140f501a74384cefad4f45a782249d7c""public""0""public""1f3d3660941041548968e3a8d4b8ba49""0"5"0""Atch 3 - CMMC-Information.pdf"2039567"file"".pdf""1""2026-03-17T11:34:05.241+00:00""afd5d879b0bb4969a1f06b3df271f9fe""public""0""public""cf91465fc68e4902a5abd7220728be24""0"4"0""Atch 2 - AEDC Velocity Alliance Base Articles - 5 Mar 26.pdf"387278"file"".pdf""1""2026-03-17T11:34:05.241+00:00""66edc0c77b5147fa8bfcaf213fa70618""public""0""public""2a96de9a3eb24909bf0757903eb2c602""0"3"0""Atch 1 - AEDC Velocity Alliance Program Objectives-5 Mar 26.pdf"205130"file"".pdf""1""2026-03-17T11:34:05.241+00:00""98112adf38bd4f08827e428d372d9deb""public""0""public""c7926e72176345abb679bd6df8cbebdc""0"2"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e99df8af160241869acdb3a355802734), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.