The Air Force and 76 CMXG intend to solicit and issue a sole-source contract to Hexagon Metrology Intelligence, Inc. under the authority of RFO 6.103-1(b) and 10 U.S.C. 3204(a)(1) for the following:
Description: The following sets forth the minimum requirements for continuous Remedial Maintenance (RM), Preventive Maintenance (PM), and Calibration services to support an eventual total of (8) Leica Laser Trackers. The Contractor shall provide all labor, tools, equipment, test equipment, material,parts, quality control, transportation and inspection manuals necessary to perform the PM/RM and Calibration for the Oklahoma City–Air Logistics Complex at the Contractor’s off-site facility.
Contemplated contract details:
• Firm-fixed price (FFP)
• Commercial, Sole-Source Acquisition
• FSC/PSC – J052
• NAICS – 811310
• Size Standard – $12.5 million
Requirements for Award:
System for Award Management (SAM) is required to receive any award. Vendors can register electronically at https://sam.gov/content/home.
The contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform PM/RM and Calibration for the Oklahoma City–Air Logistics Complex at the contractor's off-site facility. Services cover up to eight Leica Laser Trackers, including comprehensive calibration, scheduled preventive maintenance, unscheduled remedial maintenance, and delivery of calibration certificates traceable to NIST and meeting ISO 17025 requirements. The base period is 02 Nov 2026 to 01 Nov 2027, with four one-year options.
We post new equipment maintenance & rental opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"73145-3303""TINKER AFB""OK""USA""CP 405 734 9107""3001 STAFF DR STE 2S76""Solicitation FA812527Q0003.pdf"517578"file"".pdf""1""2026-10-06T14:24:05.868+00:00""a7e5cf6b61da424ea2386a77c296f8b2""public""0""public""56729b85605a42758519e426bdcac084""0"13"0""Serv C26-132 Leica RMPM Calibration- PWS_Redacted.pdf"489880"file"".pdf""1""2026-10-06T14:24:05.868+00:00""ddad3e970710480391f1f6ffdefa1439""public""0""public""7a546e1e9922400582d7db356d212e71""0"11"0""Appendix B_Equipment List (GFP)_Redacted.pdf"209024"file"".pdf""1""2026-10-06T14:24:05.868+00:00""24ffdd698f754c1ba651b61115665b49""public""0""public""e6f35363d1434b0bb7bb6d312a3d1c28""0"5"0""WD 2015-5315 Rev31 (17Aug26).pdf"4740805"file"".pdf""1""2026-10-06T14:24:05.868+00:00""51e2b44433fb4eedb9450471aa4c99c9""public""0""public""93fe6bfd6339427db657ebc655d2a6c8""0"4"0"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e6a36e14052749038e13f84ff26858b7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.