Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
The work includes all items described in the project description and attached drawings and specifications. The project involves the complete demolition of the existing fire alarm system and electrical infrastructure (except the existing pad-mounted transformer), and the removal of all existing plumbing fixtures and piping. New work includes a 3-ply modified bitumen roof system, a new BACnet DDC system, a new Simplex, Notifier, or Fire-lite fire alarm system, a new wet pipe sprinkler system, a complete below-ground and above-ground vehicle exhaust system, prefabricated pre-insulated double-wall ductwork, and a new compressed air system. The civil scope includes full-depth removal of all asphalt pavement and replacement with reinforced concrete paving, new concrete curbs, gutters, sidewalks, storm drainage, and sanitary sewer work. The building will be unoccupied and done in one phase.
We post new general contractors opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""Amend 0007.pdf"33976"file"".pdf""1""2026-11-18T21:08:25.971+00:00""f863a5ce693c43918727a2f932a9fbb1""public""0""public""2ecc7829bf0d4c3593f4391164a0281a""0"12"0""Amend 0006.pdf"4311396"file"".pdf""1""2026-11-18T17:41:13.819+00:00""cd00bbdcd77b473b96475f5c184dbfd1""public""0""public""b53d58b14f3648f1b1e10e069bdf844f""0"11"0""Amend 0005.pdf"16459576"file"".pdf""1""2026-11-05T20:28:49.781+00:00""186c4b994e9a4bf2a08d1bd7941e4d77""public""0""public""973c85beaed84805ab2ea04a358dc5a6""0"10"0""Amend 0004.pdf"5222544"file"".pdf""1""2026-11-04T18:20:02.418+00:00""668c916c54854f3b83e56adc8b605740""public""0""public""ad85ff3c3be54c05924672f6121b16d8""0"9"0""Amend 0003.pdf"219104"file"".pdf""1""2026-11-02T19:05:59.377+00:00""3fa644ff2ced44f4a8fa7d954e29c093""public""0""public""b51649614ac04b299dc93a985a8134c9""0"8"0""Amend 0002.pdf"865053"file"".pdf""1""2026-10-28T17:47:58.964+00:00""5b2fcc3a8c0044619d498941ed3f4065""public""0""public""a0c45a4727f1477ca3f4e10178b14189""0"7"0""Amend 0001.pdf"2205457"file"".pdf""1""2026-10-22T18:16:39.666+00:00""ad699defffd8450a88acfd265fed7011""public""0""public""dda03faf21c644759f8bdccbd3b2ccc0""0"6"0""Pricing Sheet.pdf"75540"file"".pdf""1""2026-10-22T17:51:02.687+00:00""aa507fc4163a416ebb9e8e8bd0a5ce39""public""0""public""d442c731d12245f898b9f50d8897f26d""0"5"0""RFP 230040.pdf"152254"file"".pdf""1""2026-10-22T16:54:40.556+00:00""2e548af3e0924214ac72b9d989bf84e9""public""0""public""f5d4074e87fe4131bfd513cb3c1567eb""0"4"0""23-0040 APPD.pdf"221007"file"".pdf""1""2026-10-22T16:54:40.556+00:00""9b3d86b9e0e34aaabbbee4e53c18fe3f""public""0""public""dca72cf7732043948c948ea3f9166b5b""0"3"0""N4008523B0040 DwgsSigned.pdf"181650311"file"".pdf""1""2026-10-22T16:54:40.556+00:00""f223876ddf9b434bbe26646208f427f3""public""0""public""5b6642577cba4259bf8a85f12248ceee""0"2"0""N4008523B0040 SpecsSigned.pdf"8432304"file"".pdf""1""2026-10-22T16:54:40.556+00:00""da4e6eef38bf4fd08f9b000d5cd63b6d""public""0""public""33eaa703d6524163862f17c3c6b060e2""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e4744972f4e84b3286e6e79ef5250186), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.