The Defense Logistics Agency Aviation at Huntsville seeks production and hardware for Poland Lower Tier Air and Missile Defense System support equipment as a standalone delivery order under the LTAMDS indefinite-delivery indefinite-quantity contract, with performance at Aberdeen Proving Ground, Maryland.
Proposals are due before 4:00 p.m. Central Standard Time on December 18, 2026.
Offerors are asked to indicate intent to propose in writing within five business days and to keep proposals valid for a minimum of 180 days from receipt by the government.
The effort supports the Search Track Acquire Radiate Eliminate Project Office and will reference terms in Raytheon Corporate Basic Agreement SPRBL1-26-H-A001 under a pending LTAMDS IDIQ expected to be in place before award.
The contract type is hybrid, with firm-fixed-price for BMC, SRPT and frequency converter hardware and cost-plus-fixed-fee for frequency converter design and development and nonrecurring engineering.
Raytheon is asked to propose a contract line item structure covering only the production and hardware portion while attached statements of work cover both hardware and services.
The requirement is directed to Raytheon in Andover, Massachusetts, CAGE 05716, as a large business, with provision for a formal solicitation if another supplier expresses interest.
Proposals must be submitted in writing directly to the identified contracting team and include one summary schedule with fully supportable cost data under FAR 15.408 Table 15-2, working Excel formulas, labor, material and subcontractor breakdowns, and indirect rate documentation.
The solicitation involves export-restricted technical data under the Arms Export Control Act with JCP certification applying and representations on covered telecommunications equipment and services under FAR 52.204-24 and DFARS 252.204-7016.
Method
Letter Request for Proposal…
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Want to know if you can be bonded for this project? Get prequalified.One free application, soft pull — sized to your work.
Know you can be bonded before you spend a week on the bid
No scramble for a bond at the deadline — it becomes a request form
Deliver production and hardware for Poland LTAMDS support equipment including BMC, SRPT, frequency converters and related nonrecurring effort
Submit a proposal with a proposed CLIN structure for the production and hardware portion only
Provide a summary schedule with fully supportable cost data, working Excel formulas, labor, material, subcontractor pricing, indirect rates and ProPricer detail per FAR 15.408 Table 15-2
Posted Scope of Work
SEE ATTACHED FOR DETAILS.
Scope, read from the documentsAI-generated
The work adds Lower Tier Air and Missile Defense System support equipment hardware to the LTAMDS IDIQ referencing Raytheon Corporate Basic Agreement SPRBL1-26-H-A001, with Poland LTAMDS production and hardware awarded as a standalone delivery order. The hybrid contract mix is firm-fixed-price for BMC, SRPT and frequency converters and cost-plus-fixed-fee for frequency converter design and development and nonrecurring engineering, with Raytheon to propose a CLIN structure for the production and hardware portion only.
More goods & materials bids in Maryland, weekly.
We post new goods & materials opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Raytheon, 350 Lowell ST, Andover, Massachusetts 01810, CAGE: 05716, Large Business, for LTAMDS Production and Hardware as a sole source to Raytheon.
When is the proposal due and how long must it stay valid?
Proposals shall be submitted before 4:00 p.m. Central Standard Time (CST), December 18, 2026, and shall remain valid for a minimum of one hundred and eighty (180) days from receipt by the government.
What contract vehicle and type apply?
The Poland LTAMDS production and hardware will be awarded as a standalone Delivery Order under the pending LTAMDS IDIQ referencing Raytheon Corporate Basic Agreement (SPRBL1-26-H-A001), with a hybrid contract type mixing CPFF and FFP.
Who are the contracting contacts and how should communications be sent?
Mallory Medley at Mallory.Medley@dla.mil, Phone: (256) 616-6502, and Anna Phillips at Anna.phillips@dla.mil, Phone: (256) 214-9734, with all communications submitted in writing only and directly to the identified email addresses.
Full source recordEvery field SAM.gov published, untouched
Hit
Id
e3ef8aaaa8494304ae28bb0c7bdf96ec
Type
Code
o
Value
Solicitation
Type
opportunity
Award
Awardee
Title
LTAMDS Production and Hardware, Sole Source to Raytheon
R Score
0
Is Active
Yes
Is Canceled
No
Publish Date
Oct 20, 2026
Descriptions
Content
<p>SEE ATTACHED FOR DETAILS. </p>
Last Modified Date
Oct 20, 2026
Modified Date
Oct 20, 2026
Response Date
Dec 18, 2026
Modifications
Count
0
Response Time Zone
America/Chicago
Response Date Actual
Dec 18, 2026
Solicitation Number
SPRRA226R0076
Organization Hierarchy
Code
9700
Name
DEPT OF DEFENSE
Type
DEPARTMENT
Level
1
Status
active
Address
Organization Id
100000000
Code
97AS
Name
DEFENSE LOGISTICS AGENCY
Type
AGENCY
Level
2
Status
active
Address
Organization Id
300000415
Code
DLA AVIATION
Name
DLA AVIATION
Type
MAJOR COMMAND
Level
3
Status
active
Address
Organization Id
100008516
Code
DLA AV HUNTSVILLE
Name
DLA AVIATION HUNTSVILLE
Type
SUB COMMAND
Level
4
Status
active
Address
Organization Id
100091050
Code
SPRRA2
Name
DLA AVIATION AT HUNTSVILLE, AL
Type
OFFICE
Level
5
Status
active
Address
Zip
"35898-7340"
City
"REDSTONE ARSENAL"
State
"AL"
Country
"USA"
Street Address
"DLR PROCUREMENT OPERATIONS (AH)"
Street Address2
"5201 MARTIN ROAD"
Organization Id
500042649
Type
Solicitation
Title
LTAMDS Production and Hardware, Sole Source to Raytheon
Active
Yes
Detail
Type
o
Naics
Code
334511
Type
primary
Title
LTAMDS Production and Hardware, Sole Source to Raytheon
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? Get prequalified once.
Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
Prequalified bidders know they can be bonded before they write the bid — and skip the application on every one of these. The bond becomes a request form and a copy of the RFP, not a scramble at the deadline.Prequalify For Bonding →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: SAM.gov (notice e3ef8aaaa8494304ae28bb0c7bdf96ec), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.