VA Medical Center Wilmington intends to issue a construction contract. The project consists of:
The Contractor shall provide all labor, transportation, materials, equipment, and supervision required for Replace West Entrance Return Air Fan as required at the Wilmington VA Healthcare System, located at 1601 Kirkwood HWY, Wilmington, Delaware 19805.
Replace West Entrance Return Air Fan
Area is located on the roof of Building 17.
Work to take place during normal working hours.
Provide correct size crane per lift requirements.
Remove existing failed Return Air Fan.
Disconnect Electrical power, control signal cabling
Install new Return Air Fan ( provided by the VA).
COOK Model Number 245QMXD11 900 lbs shipping weigh (see Atch 1)
Properly dispose of old return air fan.
Perform all necessary commissioning and startup of new equipment.
All work to be performed in accordance with manufacturer s recommendations and guidelines.
All Federal and State Safety and Environmental guidelines shall be followed.
Work to be conducted during normal working hours. Extended hours may be arranged if necessary to fully complete performance of the work.
The contractor will need to provide a certified crane operator to remove the old parts and install the new fan motor and housing parts on the roof top.
Crane lift plan to be submitted, reviewed and approved by COR prior to commencement of work.
Verification that return fan remains integrated into existing BAS system. Currently Johnson Controls speaking BACNET.
Work to be scheduled to interfere as little as possible with normal VA operations.
Crane lift is to be performed off hours to ensure that NO personnel are below the area of swing during the crane lift evolution.
Other Specifics:
Prime Contractor to plan all phasing of work in coordination with Hospital staff in order to minimize down-time to areas affected by the project.
Construction Waste Management, Specification 01 74 19 is to be included.
Prime Contractor to maintain all infection control/ dust prevention measures required.
Consolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.
Contractor will submit picture of affected area before, during, and after construction or testing.
The contractor shall provide all labor, transportation, materials, equipment and supervision to remove the existing failed Return Air Fan, disconnect electrical power and control signal cabling, install the VA-furnished COOK Model 245QMXD11 (900 lbs), properly dispose of the old fan, and perform commissioning and startup with verification of integration into the existing Johnson Controls BACNET BAS system. Work includes providing the correctly sized crane and certified crane operator with a COR-approved lift plan, with the lift performed off hours, plus phasing coordination, Construction Waste Management Specification 01 74 19, infection control and dust prevention, submittals tracking on an Excel spreadsheet, and before, during and after photos, performed during normal working hours per manufacturer recommendations and Federal and State safety and environmental guidelines.
We post new hvac opportunities in Delaware as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""15215""PITTSBURGH""PA""USA""1010 DELAFIELD ROAD""36C24426B0025_1.docx"18423"file"".docx""1""2026-11-23T17:40:38.295+00:00""af31f42a9ab0479e98c2e404349bde4e""public""0""public""4d91b0fa18474f969f51034dc61cda96""0"1"0"Most Delaware work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e323e33e2e22476fb973b38299ae8eb2), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.