AMENDMENT 001 is issued to add site visit information.
52.236-27 SITE VISIT (CONSTRUCTION) Alternate I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-
** 10 September 2026 at 10:00 AM PDT**
(c) Participants will meet at-
USCG Pacific Strike Team, 450 Hangar Ave, Novato, CA Main Gate
(d) Interested participants must email Shawn Jenkins (shawn.t.jenkins@uscg.mil) and Jesse Yutig (Jesus.C.Yutig.CIV@uscg.mil) no later than 8 September 2026 and provide a completed Base Access Form to request attendance. Security access requirements apply.
(End of Provision)
This requirement is set aside for small businesses.
Offers are due by email to the contracting officer (primary point of contact) and contract specialist (secondary point of contact) by the due date on this announcement.
The contractor shall perform the required specified tasks and all implied tasks required by the Statement of Work.
Please see the attachments to this announcement for the solicitation and supporting documents.
Questions are due to the contracting officer and contract specialist by 11 September 2026. Questions submitted after this date may not be answered prior to the closing of this solicitation.
The contractor shall provide all labor, equipment, and materials to modernize the Women's Locker Room in Hangar #1. The work includes: providing and maintaining temporary sanitation facilities (mobile restroom, shower, handwashing) during the shutdown; demolishing and disposing of existing lockers and flooring; stripping vinyl flooring down to raw concrete, grinding polishing and applying an industrial-grade concrete sealer; installing seamless commercial-grade rubber coving along walls; furnishing assembling installing 16 new heavy-duty ventilated steel lockers, each with overhead gear storage, secure top shelf, garment rod; installing a fold-down heavy-duty ironing shelf; patching and texture-matching wall areas affected removal; and performing all work under lead-safe protocols (29 CFR 1926.62) and adhering to the attached Asbestos and Lead Survey Report.
We post new bathroom opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""94501""ALAMEDA""CA""USA""CG ISLAND, BUILDING 42""Construction Solicitation PAC Strike Team Bathroom Renovations(1).pdf"494683"file"".pdf""1""2026-09-10T13:49:54.837+00:00""11fc4f1d698d4bc8ad3de708afa58c09""public""0""public""f20b916a38894119960e62f598fd1fbf""0"4"0""BASE ACCESS FORM.xlsx"21781"file"".xlsx""1""2026-09-04T16:27:14.167+00:00""b5ef44f8e62242b095c3c6dceb47a2af""public""0""public""0a451a05528343528229ce0f4af50f8e""0"3"0""Construction Solicitation PAC Strike Team Bathroom Renovations.pdf"606127"file"".pdf""1""2026-09-02T02:01:53.986+00:00""12855d2ba1384dc3a3d58c0f92b4089e""public""2026-09-10T13:49:54.837+00:00""1""public""71f13ae99af849ba81558be18eb83f74""0"2"0""2026-09-10T13:49:54.837+00:00""USCG Pacific Strike Team - Lead ACM Survey Report.pdf"2120616"file"".pdf""1""2026-09-02T02:01:53.986+00:00""412a9a35b91b4319b9d5adb5c4867fa2""public""0""public""3414386a45844678bebd6673947c1701""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice e259fba6646f4e2384ad2e2668aa2545), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.