This project consists of providing all materials, equipment, labor, transportation, and incidentals for completion of the repair storm damage sustained on three buildings at this site.
The repairs are to include roof replacement, dry wall and insulation replacement, a door replacement, ceiling and insulation replacement, installation of gutters and downspouts, and to replace a portion of the side of the Chino Yard Office; to perform maintenance to the metal roofs on the Supervisor’s office and the Chino Shop; to repair window frames on upper windows, to caulk ALL of windows, and to install a Z bar at the roof line on the Supervisor’s Office; and to gutters and downspouts on the Chino Shop.
This project could also include, if additional funds are available, optional bid items. The optional bid items are exterior painting on the Yard Office; replace the weather stripping on two garage doors and a door sweep on a manway; and if mold is found in the Supervisor’s Office to replace the dry wall and insulation.
The contractor shall furnish all materials, equipment, labor, transportation, and incidentals to complete storm damage repairs on three buildings at the Chino Admin Site. At the Chino Yard Office, work includes asbestos abatement, roof replacement (SBS modified bituminous membrane), drywall and insulation replacement in two north offices and the common area, a door replacement, ceiling and insulation replacement, installation of gutters and downspouts, and replacement of approximately 74 square feet of siding. At the Supervisor's Office, work includes metal roof maintenance on the standing seam roof, installation of a Z-bar flashing at the apex of the upper roof, repair of upper window frames, and caulking of all windows. At the Chino Shop, work includes metal roof maintenance and installation of gutters and downspouts. Optional bid items include exterior painting on the Yard Office, weather stripping on two garage doors, and a door sweep on the manway door.
We post new gutters opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""127EAX27Q0011 Chino Emergency Repairs.pdf"262974"file"".pdf""1""2026-10-23T18:50:36.24+00:00""181a478acd8d4ac78980e8416f717da4""public""0""public""e99307012a4b48139a56f38dc589e80f""0"7"0""C04_Attachment 1 - Statement of Work.docx"11393671"file"".docx""1""2026-10-23T18:50:36.24+00:00""02bca55b32224a18afb50488c73e37f5""public""0""public""97a709de713d479b9a52502792f5f129""0"6"0""C04_Attachment 2 - Schedule of Items.docx"110851"file"".docx""1""2026-10-23T18:50:36.24+00:00""54340c3dc7b94176ad99d157d5280f7c""public""0""public""4293a17fe57b4e8ea2ad31861dcaa982""0"5"0""C04_Attachment 3 - Specifications.docx"187906"file"".docx""1""2026-10-23T18:50:36.24+00:00""0f34bd68c5524eac90d8855457a9e4a1""public""0""public""002cbf70f0014df092811321ab9eb281""0"4"0""C04_Attachment 4 - Prescott Fire Plan.pdf"175343"file"".pdf""1""2026-10-23T18:50:36.24+00:00""34b83fc1a0584fc9a6f7be58e9e35509""public""0""public""7c2b1be98c6146f58e93708634ae806d""0"3"0""C04_Attachment 5 - Prescott Spill Prevention Plan.docx"23457"file"".docx""1""2026-10-23T18:50:36.24+00:00""a6432f04b6964e328f527cacf6e9892b""public""0""public""c6449af2a3784c4bbc265025cb244001""0"2"0""C04_Attachment 6 - Wage Determination.pdf"1612741"file"".pdf""1""2026-10-23T18:50:36.24+00:00""92b6070d242d4debaf6009f588f1c137""public""0""public""e2f149b877934526818caa6f2d29fb7f""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e1a3d27a59404241a734dd0d891883c4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.