ROOF REPLACEMENT - FS 40 - JOB WALK
Commodity: ROOFING SERVICE
Category: Commodity
RFB - Request For Bid
The contractor shall remove and dispose approximately 5,500 +/- Sq. Ft. of existing asphalt shingle roof, underlayment, all penetration flashings, hip & valley flashings, and wall flashings. Replace with new asphalt shingle roof system. Tasks include removing all existing roof mastic from vents and pipe penetrations, patching pipe penetrations and providing new flashings, surface preparations including a 15% roof understructure replacement factor, installing asphalt shingle roofing systems per specifications, and daily clean-up. The contractor shall provide all parts, equipment, and labor necessary. A minimum of a 5-year roofing materials warranty and 5-year labor warranty is required.
We post new roofing opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Los Angeles RAMP (bid 232623), retrieved via the City of Los Angeles. View the official posting, and always confirm requirements and deadlines with the issuing agency.