*9/1/26 SF1449 + reminder: site visitors kindly requested to arrive 15 minutes early.
The Contractor shall replace the current, outdated fire panel and alarm system in its entirety, including the existing malfunctioning system, and shall extend coverage to include the workshop area of the building, which is not currently served by the system. The present system is outdated and has reached the end of its service life.
The new system must be compatible with existing building infrastructure and any future planned upgrades. All materials and installations must conform to Department of State (DoS) standards and applicable local building codes. The new system shall match or exceed the performance of the existing system to ensure seamless integration and long-term reliability.
The Contractor shall replace the current, outdated fire panel and alarm system in its entirety, including the existing malfunctioning system, and shall extend coverage to include the workshop area of the building. The new system must be compatible with existing building infrastructure and any future planned upgrades. All materials and installations must conform to Department of State (DoS) standards and applicable local building codes. The work includes planning and design, material procurement, cable network installation, installation and labor services, and expert acceptance and final testing.
We post new security opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20520""WASHINGTON""DC""USA""US DEPT OF STATE, 2201 C ST NW""19GE5026Q0037-combined-synopsis-solicitation.pdf"523872"file"".pdf""1""2026-09-01T08:16:46.868+00:00""2fa2676d50af4d86b3748bb4af63bb1f""public""0""public""078eb6c835714c9f84422392fbfd0268""0"32"0""19GE5026Q0037-combined-synopsis-solicitation.pdf"519379"file"".pdf""1""2026-08-28T12:28:50.715+00:00""0538cb219a134ec6a23efaca1ca032d2""public""2026-09-01T08:16:46.868+00:00""1""public""88d2cf9268d744b18a1bae69838489c8""0"31"0""2026-09-01T08:16:46.868+00:00""19GE5026Q0037-SF1449.pdf"31908"file"".pdf""1""2026-09-01T08:16:46.868+00:00""eefc7cbc160b4970bfebe69515f44f0c""public""0""public""f5ecf45f98e543ef8ef78482f959d8d6""0"30"0""26Q0037 Attach01 SOW_CurtiusFireAlarm.pdf"385476"file"".pdf""1""2026-08-28T12:28:50.715+00:00""ed4f734a797d49a7ae1515c13d9c8d01""public""0""public""8b3d96e3cbf443c08b527e32e386cdf4""0"28"0""26Q0037 Attach02 Price Curtius Annex.pdf"75742"file"".pdf""1""2026-08-28T12:28:50.715+00:00""252968bee25d4c63aeb325f128fbb7a5""public""0""public""a31cfc2cbd4941efab95f8f66ab3e637""0"24"0""26Q0037 Attach03 Drawings CurtiusFireAlarm.pdf"1458900"file"".pdf""1""2026-08-28T12:28:50.715+00:00""5cfbe01fce994a11aaba4fa4f365f384""public""0""public""963e0ad380ac40eea46a640387a4aae1""0"22"0""26Q0037 Attach04 W14.pdf"74495"file"".pdf""1""2026-08-28T12:28:50.715+00:00""c43831438a79468ea11926842854e52e""public""0""public""0140dce1ef184902a96342e808254f8e""0"19"0""26Q0037 Attach05 W14 Instructions.pdf"155386"file"".pdf""1""2026-08-28T12:28:50.715+00:00""cf29f0e5f21e4a8497cac3e0d3560c45""public""0""public""416cc3d5c9524af98c10afdf39a1d11b""0"18"0""26Q0037 Attach06 TCN.pdf"224986"file"".pdf""1""2026-08-28T12:28:50.715+00:00""d6c549187cbd4672b75f8c94c40a512f""public""0""public""e271632e6b5d406b829c191e4b63d16d""0"14"0""26Q0037 Attach07 PastPerformance.pdf"317978"file"".pdf""1""2026-08-28T12:28:50.715+00:00""774e955817a645368e01d922b172f078""public""0""public""731e164a7b5a4fe3892bf0499c57c62f""0"9"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice e0eed376e4ec455ea15419fe32b73331), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.