Generator Replacement for Quillayute Airport (UIL)
This is a commercial construction requirement set aside 100% for Small Businesses utilizing LPTA procedures.
Subject to DBA Wage Determination
Please see all attachments related to this RFQ.
Instructions can be found in Section 6 of the RFQ with corresponding Evaluation criteria found in Section 7. If submission does not meet the exact instruction requirements, the quoter will be found non-responsive.
Generator Replacement for Quillayute Airport (UIL) This is a commercial construction requirement set aside 100% for Small Businesses utilizing LPTA procedures. Subject to DBA Wage Determination Please see all attachments related to this RFQ. Instructions can be found in Section 6 of the RFQ with corresponding Evaluation criteria found in Section 7. If submission does not meet the exact instruction requirements, the quoter will be found non-responsive.
The contractor shall provide all labor, equipment, and materials to install a 50KW liquid propane generator and compatible automatic transfer switch, pour rebar-reinforced concrete pads for the generator and a 250-gallon above-ground propane tank, trench and run power feed to the NWS building, relocate the existing propane tank to the new pad, bury and install propane lines, and verify all equipment operates as intended. The work also includes obtaining all required permits, identifying buried utilities via Dig Safe 811, and complying with all airport security requirements.
We post new generators opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98115""SEATTLE""WA""USA""WESTERN ACQUISITION DIVISION""7600 SAND POINT WAY NE BLDG 1,""https://www.fedconnect.net/FedConnect/?doc=1305M327Q0009&agency=DOC"0"link""1""2026-10-29T04:30:59.906+00:00""fba45d17ec3f4018b0f21529037d1258""public""0""Click here to see more information about this opportunity on FedConnect""public""c554f5b2bd964aa0927c58699c882d1a""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e01a58bd4ac74fb19391e30585250e4e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.